CHIEF ET/TIGT ETHANOL PLANT ADAMS

Tallgrass Interstate Gas Transmission (TIGT) · Loc 700794 · ADAMS, Nebraska
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.006
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.006
Bcf/d
30-day average
0.006
30 of 30 days posted
30-day high
0.006
Nov 26
30-day low
0.005
Nov 12
Operating capacity
0.006
Bcf/d as posted, evening cycle
Utilization
100%
headroom 0%

Scheduled quantities as posted by Tallgrass Interstate Gas Transmission (TIGT) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0020.0040.0060.008Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.006+0.000
Nov 250.006+0.000
Nov 240.006+0.000
Nov 230.006-0.000
Nov 220.006+0.000
Nov 210.006+0.000
Nov 200.006+0.000
Nov 190.006+0.000
Nov 180.006+0.000
Nov 170.006+0.000
Nov 160.006+0.000
Nov 150.006+0.000
Nov 140.006+0.000
Nov 130.006+0.001
Nov 120.005+0.000
Nov 110.005+0.000
Nov 100.005+0.000
Nov 90.005+0.000
Nov 80.005+0.000
Nov 70.005+0.000
Nov 60.005+0.000
Nov 50.005-0.001
Nov 40.006+0.000
Nov 30.006+0.000
Nov 20.006+0.000
Nov 10.006-0.000
Oct 310.006+0.000
Oct 300.006+0.000
Oct 290.006+0.000
Oct 280.006—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
CHIEF ET/TIGT ETHANOL PLANT ADAMS

Placed at the center of Adams, NE — approximate; the exact meter site is not published.

Recent notices on Tallgrass Interstate Gas Transmission (TIGT)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.

SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CHIEF ET/TIGT ETHANOL PLANT ADAMS (Tallgrass Interstate Gas Transmission (TIGT) loc 700794) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tallgrass-interstate-gas-transmission-ti/700794/