Gas day Nov 26
0.002
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.002
Bcf/d
30-day average
0.002
30 of 30 days posted
30-day high
0.002
Nov 26
30-day low
0.002
Oct 31
Operating capacity
0.003
Bcf/d as posted, evening cycle
Utilization
65%
headroom 35%

Scheduled quantities as posted by Tallgrass Interstate Gas Transmission (TIGT) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0010.0020.003Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.002+0.000
Nov 250.002+0.000
Nov 240.002+0.000
Nov 230.002+0.000
Nov 220.002+0.000
Nov 210.002+0.000
Nov 200.002+0.000
Nov 190.002+0.000
Nov 180.002+0.000
Nov 170.002+0.000
Nov 160.002+0.000
Nov 150.002+0.000
Nov 140.002+0.000
Nov 130.002+0.000
Nov 120.002+0.000
Nov 110.002+0.000
Nov 100.002+0.000
Nov 90.002+0.000
Nov 80.002+0.000
Nov 70.002+0.000
Nov 60.002+0.000
Nov 50.002+0.000
Nov 40.002+0.000
Nov 30.002+0.000
Nov 20.002+0.000
Nov 10.002+0.001
Oct 310.002+0.000
Oct 300.002+0.000
Oct 290.002+0.000
Oct 280.002—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
TIGT/REP Severance Compressor Fuel

Placed at the center of Weld, CO — approximate; the exact meter site is not published.

Recent notices on Tallgrass Interstate Gas Transmission (TIGT)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.

SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, TIGT/REP Severance Compressor Fuel (Tallgrass Interstate Gas Transmission (TIGT) loc 60368) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tallgrass-interstate-gas-transmission-ti/60368/