Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

MDWRENEW/TIGT SUTHERLAND ETHANOL LI

Tallgrass Interstate Gas Transmission (TIGT) · Loc 36831 · Lincoln, Nebraska
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 27
0.001
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.001
Bcf/d
30-day average
0.001
30 of 30 days posted
30-day high
0.002
Nov 25
30-day low
0.001
Nov 14
Operating capacity
0.003
Bcf/d as posted, evening cycle
Utilization
41%
headroom 59%

Scheduled quantities as posted by Tallgrass Interstate Gas Transmission (TIGT) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0010.0010.0020.002Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.001+0.000
Nov 260.001-0.001
Nov 250.002+0.000
Nov 240.002+0.001
Nov 230.001+0.000
Nov 220.001+0.000
Nov 210.001+0.000
Nov 200.001+0.000
Nov 190.001+0.000
Nov 180.001+0.000
Nov 170.001+0.000
Nov 160.001+0.000
Nov 150.001+0.000
Nov 140.001+0.000
Nov 130.001-0.000
Nov 120.001+0.000
Nov 110.001+0.000
Nov 100.001-0.000
Nov 90.001+0.000
Nov 80.001+0.000
Nov 70.001-0.000
Nov 60.001+0.000
Nov 50.001+0.000
Nov 40.001-0.000
Nov 30.001+0.000
Nov 20.001+0.000
Nov 10.001+0.000
Oct 310.001+0.000
Oct 300.001+0.000
Oct 290.001—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
MDWRENEW/TIGT SUTHERLAND ETHANOL LI

Placed at the center of Lincoln, NE — approximate; the exact meter site is not published.

Recent notices on Tallgrass Interstate Gas Transmission (TIGT)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point.

SEV 3/5[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026
Tallgrass Energy · posted 2026-11-17 · effective 2026-11-17 · informational
Tallgrass Energy · posted 2026-10-30 · effective 2026-10-30 · capacity constraint
Trailblazer Pipeline (TPC) Update #18 restricts Segment 20 capacity to 808 MDth/d (0.808 Bcf/d) effective Gas Day November 1, 2026, until further notice -- a slight tightening from Update #17's 816 MDth/d cap. The third-party operational issue at Bertrand Compressor Station remai…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MDWRENEW/TIGT SUTHERLAND ETHANOL LI (Tallgrass Interstate Gas Transmission (TIGT) loc 36831) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tallgrass-interstate-gas-transmission-ti/36831/