Gas day Nov 26
0.004
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.004
Bcf/d
30-day average
0.003
30 of 30 days posted
30-day high
0.005
Nov 23
30-day low
0.001
Nov 17
Operating capacity
0.500
Bcf/d as posted, none cycle
Utilization
1%
headroom 99%
Scheduled quantities as posted by Rover Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.004 | +0.000 |
| Nov 25 | 0.004 | -0.001 |
| Nov 24 | 0.004 | -0.001 |
| Nov 23 | 0.005 | +0.000 |
| Nov 22 | 0.005 | +0.000 |
| Nov 21 | 0.005 | +0.001 |
| Nov 20 | 0.004 | +0.000 |
| Nov 19 | 0.004 | +0.000 |
| Nov 18 | 0.004 | +0.003 |
| Nov 17 | 0.001 | +0.000 |
| Nov 16 | 0.001 | +0.000 |
| Nov 15 | 0.001 | +0.000 |
| Nov 14 | 0.001 | -0.002 |
| Nov 13 | 0.003 | +0.000 |
| Nov 12 | 0.003 | +0.000 |
| Nov 11 | 0.003 | +0.000 |
| Nov 10 | 0.003 | +0.001 |
| Nov 9 | 0.002 | +0.000 |
| Nov 8 | 0.002 | +0.000 |
| Nov 7 | 0.002 | -0.001 |
| Nov 6 | 0.003 | +0.000 |
| Nov 5 | 0.003 | +0.000 |
| Nov 4 | 0.003 | +0.000 |
| Nov 3 | 0.003 | +0.000 |
| Nov 2 | 0.003 | +0.000 |
| Nov 1 | 0.003 | +0.002 |
| Oct 31 | 0.001 | +0.000 |
| Oct 30 | 0.001 | -0.002 |
| Oct 29 | 0.003 | +0.000 |
| Oct 28 | 0.003 | — |
77 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Rover PipelineState only (West Virginia) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
No recent notices matched or named this point, and no severity 3+ notices on Rover Pipeline in the last 30 days. See all Rover Pipeline notices.
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on Rover Pipeline
- SHERWOOD 0.838 Bcf/d
- Cadiz-ORS 0.562 Bcf/d
- HARMON CREEK 0.554 Bcf/d
- MAJORSVILLE 0.429 Bcf/d
- Berne 0.275 Bcf/d
- Seneca 0.252 Bcf/d
- Clarington-Eureka 0.195 Bcf/d
- REVOLUTION 0.178 Bcf/d
Cite thisEnercast PipeScrape, IRON BANK (Rover Pipeline loc 70044) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/rover/70044/