Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

Clarington-Eureka

Rover Pipeline · Loc 70011 · Ohio
Gathering receipt · counted in Supply / Production
Gas day Nov 26
0.195
Bcf/d scheduled
Δ Day-over-day
+0.029
vs Nov 25
7-day average
0.186
Bcf/d
30-day average
0.207
30 of 30 days posted
30-day high
0.272
Nov 3
30-day low
0.155
Nov 17
Operating capacity
0.350
Bcf/d as posted, none cycle
Utilization
56%
headroom 44%

Scheduled quantities as posted by Rover Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.195+0.029
Nov 250.166-0.037
Nov 240.203+0.019
Nov 230.183+0.000
Nov 220.183+0.000
Nov 210.183-0.007
Nov 200.190+0.021
Nov 190.170-0.046
Nov 180.216+0.061
Nov 170.155-0.060
Nov 160.215-0.015
Nov 150.230+0.000
Nov 140.230+0.012
Nov 130.218+0.025
Nov 120.192-0.031
Nov 110.223+0.018
Nov 100.205-0.005
Nov 90.210+0.019
Nov 80.191+0.001
Nov 70.190-0.012
Nov 60.202+0.028
Nov 50.174-0.039
Nov 40.213-0.059
Nov 30.272+0.035
Nov 20.237+0.013
Nov 10.225+0.014
Oct 310.210-0.030
Oct 300.240+0.021
Oct 290.220-0.047
Oct 280.266—
77 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Rover Pipeline

Rover PipelineState only (Ohio) — the meter's exact site is not geocoded; the ring marks the state, not the point.

No recent notices matched or named this point, and no severity 3+ notices on Rover Pipeline in the last 30 days. See all Rover Pipeline notices.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Clarington-Eureka (Rover Pipeline loc 70011) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/rover/70011/