Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

Seneca

Rover Pipeline · Loc 70002 · Ohio
Processing plant · counted in Supply / Production
Gas day Nov 26
0.252
Bcf/d scheduled
Δ Day-over-day
-0.000
vs Nov 25
7-day average
0.263
Bcf/d
30-day average
0.270
30 of 30 days posted
30-day high
0.309
Nov 5
30-day low
0.196
Nov 18
Operating capacity
0.800
Bcf/d as posted, none cycle
Utilization
31%
headroom 69%

Scheduled quantities as posted by Rover Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.300.40Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.252-0.000
Nov 250.252+0.001
Nov 240.251-0.024
Nov 230.275+0.000
Nov 220.275+0.000
Nov 210.275+0.013
Nov 200.263+0.006
Nov 190.256+0.060
Nov 180.196-0.042
Nov 170.238-0.027
Nov 160.265+0.005
Nov 150.260+0.008
Nov 140.252+0.004
Nov 130.248-0.043
Nov 120.291+0.000
Nov 110.291+0.016
Nov 100.275-0.014
Nov 90.289+0.000
Nov 80.289+0.000
Nov 70.289+0.001
Nov 60.288-0.022
Nov 50.309+0.007
Nov 40.303+0.010
Nov 30.293+0.014
Nov 20.279+0.000
Nov 10.279-0.007
Oct 310.286+0.000
Oct 300.286-0.003
Oct 290.289+0.079
Oct 280.210—
77 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Rover Pipeline

Rover PipelineState only (Ohio) — the meter's exact site is not geocoded; the ring marks the state, not the point.

No recent notices matched or named this point, and no severity 3+ notices on Rover Pipeline in the last 30 days. See all Rover Pipeline notices.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Seneca (Rover Pipeline loc 70002) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/rover/70002/