Gas day Nov 27
0.547
Bcf/d scheduled
Δ Day-over-day
-0.000
vs Nov 26
7-day average
0.523
Bcf/d
30-day average
0.549
30 of 30 days posted
30-day high
0.593
Nov 6
30-day low
0.489
Nov 21
Operating capacity
0.950
Bcf/d as posted, none cycle
Utilization
58%
headroom 42%

Scheduled quantities as posted by Rover Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.200.400.60Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.547-0.000
Nov 260.547+0.002
Nov 250.545+0.014
Nov 240.532+0.030
Nov 230.501+0.000
Nov 220.501+0.012
Nov 210.489-0.018
Nov 200.507-0.020
Nov 190.527-0.016
Nov 180.542-0.011
Nov 170.553-0.008
Nov 160.562+0.010
Nov 150.551-0.005
Nov 140.557+0.004
Nov 130.553-0.036
Nov 120.589+0.024
Nov 110.565+0.022
Nov 100.543-0.024
Nov 90.567-0.019
Nov 80.587-0.001
Nov 70.588-0.005
Nov 60.593+0.035
Nov 50.558+0.010
Nov 40.548+0.003
Nov 30.545-0.004
Nov 20.549+0.040
Nov 10.509-0.075
Oct 310.584+0.030
Oct 300.554-0.020
Oct 290.574—
78 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Rover Pipeline

Rover PipelineState only (Ohio) — the meter's exact site is not geocoded; the ring marks the state, not the point.

No recent notices matched or named this point, and no severity 3+ notices on Rover Pipeline in the last 30 days. See all Rover Pipeline notices.