Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

TWIN BRIDGES/REX HENDRICKS FUEL

Rockies Express · Loc 60642 · Indiana
Gathering receipt · counted in Supply / Production
Gas day Nov 26
-0.001
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
-0.001
Bcf/d
30-day average
-0.001
30 of 30 days posted
30-day high
-0.001
Nov 26
30-day low
-0.001
Nov 24
Operating capacity
0.003
Bcf/d as posted, evening cycle
Utilization
16%
headroom 84%

Scheduled quantities as posted by Rockies Express on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.001-0.001-0.001-0.0000.000Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.001+0.000
Nov 25-0.001+0.000
Nov 24-0.001-0.000
Nov 23-0.001+0.000
Nov 22-0.001+0.000
Nov 21-0.001+0.000
Nov 20-0.001+0.000
Nov 19-0.001+0.000
Nov 18-0.001+0.000
Nov 17-0.001+0.000
Nov 16-0.001+0.000
Nov 15-0.001+0.000
Nov 14-0.001+0.000
Nov 13-0.001+0.000
Nov 12-0.001+0.000
Nov 11-0.001+0.000
Nov 10-0.001+0.000
Nov 9-0.001+0.000
Nov 8-0.001+0.000
Nov 7-0.001+0.000
Nov 6-0.001+0.000
Nov 5-0.001+0.000
Nov 4-0.001+0.000
Nov 3-0.001+0.000
Nov 2-0.001+0.000
Nov 1-0.001+0.000
Oct 31-0.001+0.000
Oct 30-0.001+0.000
Oct 29-0.001-0.000
Oct 28-0.001—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Rockies Express

Rockies ExpressState only (Indiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Rockies Express

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Rockies Express notices →

Rockies Express · posted 2026-11-16 · effective 2026-11-16 · informational
Rockies Express · posted 2026-10-30 · effective 2026-10-30 · compressor issue
REX Update #19 continues the Bertrand Compressor Station operational issue on Segment 250, raising the West-to-East capacity cap marginally to 1.133 Bcf/d (from 1.094 Bcf/d in Update #18), effective Timely cycle Gas Day November 1, 2026, until further notice. Primary firm, second…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, TWIN BRIDGES/REX HENDRICKS FUEL (Rockies Express loc 60642) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/rex/60642/