Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

TWIN BRIDGES/REX RNG SUPPLY HENDRICKS

Rockies Express · Loc 60494 · Indiana
Processing plant · counted in Supply / Production
Gas day Nov 27
0.003
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.003
Bcf/d
30-day average
0.003
30 of 30 days posted
30-day high
0.003
Nov 8
30-day low
0.003
Nov 27
Operating capacity
0.006
Bcf/d as posted, evening cycle
Utilization
50%
headroom 50%

Scheduled quantities as posted by Rockies Express on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0010.0020.0030.004Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.003+0.000
Nov 260.003+0.000
Nov 250.003+0.000
Nov 240.003+0.000
Nov 230.003+0.000
Nov 220.003+0.000
Nov 210.003+0.000
Nov 200.003+0.000
Nov 190.003+0.000
Nov 180.003+0.000
Nov 170.003+0.000
Nov 160.003+0.000
Nov 150.003+0.000
Nov 140.003+0.000
Nov 130.003+0.000
Nov 120.003+0.000
Nov 110.003+0.000
Nov 100.003+0.000
Nov 90.003-0.000
Nov 80.003+0.000
Nov 70.003+0.000
Nov 60.003+0.000
Nov 50.003+0.000
Nov 40.003+0.000
Nov 30.003+0.000
Nov 20.003+0.000
Nov 10.003+0.000
Oct 310.003+0.000
Oct 300.003+0.000
Oct 290.003—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Rockies Express

Rockies ExpressState only (Indiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Rockies Express

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Rockies Express notices →

Rockies Express · posted 2026-11-16 · effective 2026-11-16 · informational
Rockies Express · posted 2026-10-30 · effective 2026-10-30 · compressor issue
REX Update #19 continues the Bertrand Compressor Station operational issue on Segment 250, raising the West-to-East capacity cap marginally to 1.133 Bcf/d (from 1.094 Bcf/d in Update #18), effective Timely cycle Gas Day November 1, 2026, until further notice. Primary firm, second…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, TWIN BRIDGES/REX RNG SUPPLY HENDRICKS (Rockies Express loc 60494) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/rex/60494/