WFS/REX OPAL (OT #25) LINCOLN

Rockies Express · Loc 43462 · Wyoming
Processing plant · counted in Supply / Production
Gas day Nov 27
0.043
Bcf/d scheduled
Δ Day-over-day
-0.002
vs Nov 26
7-day average
0.036
Bcf/d
30-day average
0.028
30 of 30 days posted
30-day high
0.058
Nov 18
30-day low
0.010
Nov 13
Operating capacity
0.625
Bcf/d as posted, evening cycle
Utilization
7%
headroom 93%

Scheduled quantities as posted by Rockies Express on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0200.0400.060Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.043-0.002
Nov 260.045-0.007
Nov 250.052+0.037
Nov 240.015-0.017
Nov 230.032+0.000
Nov 220.032+0.000
Nov 210.032-0.017
Nov 200.049+0.019
Nov 190.030-0.028
Nov 180.058+0.023
Nov 170.035+0.021
Nov 160.015+0.000
Nov 150.015+0.003
Nov 140.012+0.002
Nov 130.010-0.032
Nov 120.042+0.000
Nov 110.042+0.005
Nov 100.037+0.017
Nov 90.020+0.000
Nov 80.020+0.000
Nov 70.020+0.001
Nov 60.019+0.004
Nov 50.015-0.011
Nov 40.026+0.013
Nov 30.013-0.009
Nov 20.022+0.001
Nov 10.021-0.002
Oct 310.022+0.000
Oct 300.022+0.003
Oct 290.020—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Rockies Express

Rockies ExpressState only (Wyoming) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Rockies Express

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Rockies Express notices →

Rockies Express · posted 2026-11-16 · effective 2026-11-16 · informational
Rockies Express · posted 2026-10-30 · effective 2026-10-30 · compressor issue
REX Update #19 continues the Bertrand Compressor Station operational issue on Segment 250, raising the West-to-East capacity cap marginally to 1.133 Bcf/d (from 1.094 Bcf/d in Update #18), effective Timely cycle Gas Day November 1, 2026, until further notice. Primary firm, second…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, WFS/REX OPAL (OT #25) LINCOLN (Rockies Express loc 43462) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/rex/43462/