LANGLEY GULCH

Northwest Pipeline · Loc 737
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.058
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.052
Bcf/d
30-day average
0.041
30 of 30 days posted
30-day high
0.058
Nov 27
30-day low
0.024
Oct 31
Operating capacity
0.060
Bcf/d as posted, evening cycle
Utilization
97%
headroom 3%

Scheduled quantities as posted by Northwest Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.060Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.058+0.000
Nov 260.058+0.000
Nov 250.058+0.000
Nov 240.058+0.015
Nov 230.044+0.000
Nov 220.044+0.000
Nov 210.044+0.000
Nov 200.044+0.000
Nov 190.044+0.000
Nov 180.044+0.000
Nov 170.044+0.000
Nov 160.044+0.000
Nov 150.044+0.000
Nov 140.044+0.000
Nov 130.044+0.000
Nov 120.044+0.000
Nov 110.044+0.006
Nov 100.038+0.011
Nov 90.027+0.000
Nov 80.027+0.000
Nov 70.027-0.005
Nov 60.032-0.005
Nov 50.037+0.000
Nov 40.037+0.007
Nov 30.030+0.000
Nov 20.030+0.000
Nov 10.030+0.006
Oct 310.024-0.025
Oct 300.049+0.002
Oct 290.046—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Northwest PipelineLANGLEY GULCH

Northwest PipelinePlant location from EIA Form 860 (plant 57028).

Recent notices on Northwest Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northwest Pipeline notices →

Northwest Pipeline · posted 2026-11-03 · operational alert
Northwest Pipeline has issued an OFO Recall Advisory and Operational Flow Order (OFO) effective Gas Day November 4, 2026 and until further notice, through the Roosevelt compressor station. Northbound scheduled quantities are currently exceeding design capacity of 0.546 Bcf/d (0.6…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, LANGLEY GULCH (Northwest Pipeline loc 737) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/northwest/737/