Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

RIVER ROAD

Northwest Pipeline · Loc 22237
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.048
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.047
Bcf/d
30-day average
0.045
30 of 30 days posted
30-day high
0.048
Nov 10
30-day low
0.027
Nov 13
Operating capacity
0.048
Bcf/d as posted, evening cycle
Utilization
100%
headroom 0%

Scheduled quantities as posted by Northwest Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.060Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.048+0.000
Nov 260.048+0.000
Nov 250.048+0.000
Nov 240.048+0.001
Nov 230.047+0.000
Nov 220.047+0.000
Nov 210.047+0.000
Nov 200.047+0.000
Nov 190.047+0.000
Nov 180.047+0.001
Nov 170.046+0.001
Nov 160.045+0.000
Nov 150.045+0.000
Nov 140.045+0.018
Nov 130.027-0.020
Nov 120.048+0.006
Nov 110.042-0.006
Nov 100.048+0.002
Nov 90.046+0.000
Nov 80.046+0.000
Nov 70.046+0.000
Nov 60.046-0.000
Nov 50.046+0.000
Nov 40.046+0.001
Nov 30.046+0.004
Nov 20.042+0.001
Nov 10.041-0.002
Oct 310.043+0.003
Oct 300.040-0.004
Oct 290.044—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Northwest PipelineRIVER ROAD

Northwest PipelinePlant location from EIA Form 860 (plant 7605).

Recent notices on Northwest Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northwest Pipeline notices →

Northwest Pipeline · posted 2026-11-03 · operational alert
Northwest Pipeline has issued an OFO Recall Advisory and Operational Flow Order (OFO) effective Gas Day November 4, 2026 and until further notice, through the Roosevelt compressor station. Northbound scheduled quantities are currently exceeding design capacity of 0.546 Bcf/d (0.6…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, RIVER ROAD (Northwest Pipeline loc 22237) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/northwest/22237/