Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

BERWICK

Northwest Pipeline · Loc 359466
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.079
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.079
Bcf/d
30-day average
0.078
30 of 30 days posted
30-day high
0.082
Oct 29
30-day low
0.075
Nov 9
Operating capacity
0.130
Bcf/d as posted, evening cycle
Utilization
61%
headroom 39%

Scheduled quantities as posted by Northwest Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.079+0.000
Nov 260.079+0.000
Nov 250.079+0.000
Nov 240.079+0.000
Nov 230.079+0.000
Nov 220.079+0.000
Nov 210.079+0.000
Nov 200.079+0.000
Nov 190.079+0.000
Nov 180.079+0.001
Nov 170.078+0.000
Nov 160.078+0.000
Nov 150.078+0.000
Nov 140.078+0.000
Nov 130.078+0.000
Nov 120.078+0.000
Nov 110.078+0.000
Nov 100.078+0.003
Nov 90.075+0.000
Nov 80.075+0.000
Nov 70.075-0.005
Nov 60.080+0.000
Nov 50.080+0.002
Nov 40.078+0.000
Nov 30.078+0.000
Nov 20.078+0.000
Nov 10.078+0.001
Oct 310.077+0.000
Oct 300.077-0.005
Oct 290.082—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Northwest PipelineBERWICK

Northwest PipelinePlaced at the center of Lewis, WA — approximate; the exact meter site is not published.

Recent notices on Northwest Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Northwest Pipeline notices →

Northwest Pipeline · posted 2026-11-03 · operational alert
Northwest Pipeline has issued an OFO Recall Advisory and Operational Flow Order (OFO) effective Gas Day November 4, 2026 and until further notice, through the Roosevelt compressor station. Northbound scheduled quantities are currently exceeding design capacity of 0.546 Bcf/d (0.6…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, BERWICK (Northwest Pipeline loc 359466) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/northwest/359466/