Gas day Nov 26
0.002
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.001
Bcf/d
30-day average
0.002
30 of 30 days posted
30-day high
0.003
Nov 13
30-day low
0.002
Nov 26
Operating capacity
0.033
Bcf/d as posted, evening cycle
Utilization
5%
headroom 95%
Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.002 | +0.000 |
| Nov 25 | 0.002 | +0.000 |
| Nov 24 | 0.002 | +0.000 |
| Nov 23 | 0.002 | +0.000 |
| Nov 22 | 0.002 | +0.000 |
| Nov 21 | 0.002 | +0.000 |
| Nov 20 | 0.002 | +0.000 |
| Nov 19 | 0.002 | +0.000 |
| Nov 18 | 0.002 | +0.000 |
| Nov 17 | 0.002 | +0.000 |
| Nov 16 | 0.002 | +0.000 |
| Nov 15 | 0.002 | +0.000 |
| Nov 14 | 0.002 | -0.001 |
| Nov 13 | 0.003 | +0.000 |
| Nov 12 | 0.003 | +0.000 |
| Nov 11 | 0.003 | +0.001 |
| Nov 10 | 0.002 | +0.000 |
| Nov 9 | 0.002 | +0.000 |
| Nov 8 | 0.002 | +0.000 |
| Nov 7 | 0.002 | +0.000 |
| Nov 6 | 0.002 | +0.000 |
| Nov 5 | 0.002 | +0.000 |
| Nov 4 | 0.002 | +0.000 |
| Nov 3 | 0.002 | +0.000 |
| Nov 2 | 0.002 | +0.000 |
| Nov 1 | 0.002 | -0.001 |
| Oct 31 | 0.002 | +0.001 |
| Oct 30 | 0.002 | +0.000 |
| Oct 29 | 0.002 | +0.000 |
| Oct 28 | 0.002 | — |
84 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Natural Gas Pipeline (NGPL)Placed at the center of Cass, TX — approximate; the exact meter site is not published.
Notices
Recent notices on Natural Gas Pipeline (NGPL)
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →
Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other End Use (Industrial) meters on Natural Gas Pipeline (NGPL)
- GPC/NGPL MUSCATI 0.022 Bcf/d
- ONE EART/NGPL ETHANOL PLANT MC LEAN 0.010 Bcf/d
- PAMPA/NGPL GRAY 0.010 Bcf/d
- PATRIOT/NGPL ETHANOL HENRY 0.009 Bcf/d
- VALMSC/NGPL CART 0.009 Bcf/d
- P&G/NGPL CAPE GI 0.008 Bcf/d
- NORTHMID/NGPL TITAN BECKHAM RD DEL 0.007 Bcf/d
- HERETHNL/NGPL DE 0.006 Bcf/d
Cite thisEnercast PipeScrape, GRAPHIC/NGPL CAS (Natural Gas Pipeline (NGPL) loc 902923) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/902923/