Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

P&G/NGPL CAPE GI

Natural Gas Pipeline (NGPL) · Loc 11435 · Cape Girardeau, Missouri
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.008
Bcf/d scheduled
Δ Day-over-day
+0.001
vs Nov 25
7-day average
0.009
Bcf/d
30-day average
0.008
30 of 30 days posted
30-day high
0.011
Nov 20
30-day low
0.001
Oct 29
Operating capacity
0.049
Bcf/d as posted, evening cycle
Utilization
16%
headroom 84%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0050.0100.015Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.008+0.001
Nov 250.007-0.001
Nov 240.008-0.001
Nov 230.009+0.000
Nov 220.009+0.000
Nov 210.009-0.001
Nov 200.011+0.000
Nov 190.011+0.000
Nov 180.011+0.002
Nov 170.009+0.000
Nov 160.009+0.000
Nov 150.009+0.000
Nov 140.009+0.002
Nov 130.007-0.001
Nov 120.008+0.000
Nov 110.008-0.000
Nov 100.009+0.002
Nov 90.006+0.000
Nov 80.006+0.000
Nov 70.006-0.000
Nov 60.007+0.000
Nov 50.006+0.000
Nov 40.006+0.001
Nov 30.005-0.004
Nov 20.009+0.000
Nov 10.009+0.004
Oct 310.006+0.000
Oct 300.006+0.005
Oct 290.001+0.000
Oct 280.001—
84 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)P&G/NGPL CAPE GI

Natural Gas Pipeline (NGPL)Placed at the center of Cape Girardeau, MO — approximate; the exact meter site is not published.

Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, P&G/NGPL CAPE GI (Natural Gas Pipeline (NGPL) loc 11435) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/11435/