Enercast — at the moment it matters
Home / Daily Summary / End Use (Industrial) / Meter

CHEVRON/NGPL FLOWNATION SHELL RD DE

Natural Gas Pipeline (NGPL) · Loc 56884 · LEA, New Mexico
Industrial end-user delivery · counted in End Use (Industrial)
Gas day Nov 26
0.002
Bcf/d scheduled
Δ Day-over-day
-0.000
vs Nov 25
7-day average
0.002
Bcf/d
30-day average
0.001
30 of 30 days posted
30-day high
0.005
Nov 23
30-day low
0.000
Nov 13
Operating capacity
0.013
Bcf/d as posted, evening cycle
Utilization
11%
headroom 89%

Scheduled quantities as posted by Natural Gas Pipeline (NGPL) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the End Use (Industrial) page.

0.0000.0020.0040.006Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.002-0.000
Nov 250.002+0.000
Nov 240.002-0.003
Nov 230.005+0.003
Nov 220.002+0.000
Nov 210.002+0.000
Nov 200.002+0.000
Nov 190.001+0.000
Nov 180.001+0.000
Nov 170.001+0.001
Nov 160.001-0.000
Nov 150.001+0.000
Nov 140.001+0.001
Nov 130.000+0.000
Nov 120.000+0.000
Nov 110.000-0.000
Nov 100.000-0.000
Nov 90.001+0.000
Nov 80.001+0.000
Nov 70.001+0.000
Nov 60.001+0.000
Nov 50.001-0.001
Nov 40.002-0.000
Nov 30.002+0.000
Nov 20.002+0.000
Nov 10.002+0.000
Oct 310.002+0.000
Oct 300.002-0.000
Oct 290.002+0.000
Oct 280.002—
84 more days on file for this meter, back to August 5, 2026. Full meter-level history is part of Institutional (API and downloads).
Natural Gas Pipeline (NGPL)CHEVRON/NGPL FLOWNATION SHELL RD DE

Natural Gas Pipeline (NGPL)Placed at the center of Lea, NM — approximate; the exact meter site is not published.

Notices that name this point

Text match on the meter’s name or location ID in the notice — last 90 days. A text match is a pointer, not a confirmed capacity impact at this meter.

Natural Gas Pipeline (NGPL) · posted 2026-11-05 · effective 2026-11-05 · informational
Natural Gas Pipeline (NGPL) · posted 2026-10-28 · effective 2026-10-28 · informational
Natural Gas Pipeline (NGPL) · posted 2026-10-28 · effective 2026-10-28 · informational
Recent notices on Natural Gas Pipeline (NGPL)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Natural Gas Pipeline (NGPL) notices →

Natural Gas Pipeline (NGPL) · posted 2026-11-18 · effective 2026-11-18 · informational
Natural Gas Pipeline (NGPL) · posted 2026-11-17 · effective 2026-11-17 · force majeure
NGPL is experiencing a unit outage force majeure at Compressor Station 168 in Bailey County, Texas (Segment 8, Permian Zone), effective gas day November 19, 2026, continuing until further notice. The scheduling constraint is enforced at CS 167, limiting northbound throughput to n…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CHEVRON/NGPL FLOWNATION SHELL RD DE (Natural Gas Pipeline (NGPL) loc 56884) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/ngpl/56884/