Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

EMP Waskom Plant ST-21 GR

Gulf Run Transmission · Loc 220040 · Texas
Processing plant · counted in Supply / Production
Gas day Nov 26
0.004
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.004
Bcf/d
30-day average
0.005
30 of 30 days posted
30-day high
0.005
Nov 23
30-day low
0.004
Nov 26
Operating capacity
0.247
Bcf/d as posted, none cycle
Utilization
2%
headroom 98%

Scheduled quantities as posted by Gulf Run Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0020.0040.006Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.004+0.000
Nov 250.004+0.000
Nov 240.004-0.001
Nov 230.005+0.000
Nov 220.005+0.000
Nov 210.005+0.000
Nov 200.005+0.000
Nov 190.005+0.000
Nov 180.005+0.000
Nov 170.005+0.000
Nov 160.005+0.000
Nov 150.005+0.000
Nov 140.005+0.000
Nov 130.005+0.000
Nov 120.005+0.000
Nov 110.005+0.000
Nov 100.005+0.000
Nov 90.005+0.000
Nov 80.005+0.000
Nov 70.005+0.000
Nov 60.005+0.000
Nov 50.005+0.000
Nov 40.005+0.000
Nov 30.005+0.000
Nov 20.005+0.000
Nov 10.005+0.000
Oct 310.005+0.000
Oct 300.005+0.000
Oct 290.005+0.000
Oct 280.005—
77 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf Run Transmission

Gulf Run TransmissionState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Gulf Run Transmission

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf Run Transmission notices →

Gulf Run Transmission · posted 2026-11-25 · effective 2026-12-02 · force majeure
Gulf Run Transmission has declared force majeure for unplanned maintenance at its Vernon Compressor Station in Jackson Parish, Louisiana (Zone 1), effective December 2, 2026 at 9:00 a.m. and anticipated to complete by December 3, 2026 at 9:00 a.m. During this one-day window, thro…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, EMP Waskom Plant ST-21 GR (Gulf Run Transmission loc 220040) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfrun/220040/