Gas day Nov 26
0.160
Bcf/d scheduled
Δ Day-over-day
-0.030
vs Nov 25
7-day average
0.153
Bcf/d
30-day average
0.164
30 of 30 days posted
30-day high
0.210
Nov 15
30-day low
0.110
Nov 18
Operating capacity
0.500
Bcf/d as posted, none cycle
Utilization
32%
headroom 68%
Scheduled quantities as posted by Gulf Run Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 26 | 0.160 | -0.030 |
| Nov 25 | 0.190 | +0.030 |
| Nov 24 | 0.160 | +0.020 |
| Nov 23 | 0.140 | -0.000 |
| Nov 22 | 0.140 | +0.000 |
| Nov 21 | 0.140 | +0.000 |
| Nov 20 | 0.140 | -0.015 |
| Nov 19 | 0.155 | +0.045 |
| Nov 18 | 0.110 | -0.050 |
| Nov 17 | 0.160 | -0.034 |
| Nov 16 | 0.194 | -0.016 |
| Nov 15 | 0.210 | +0.000 |
| Nov 14 | 0.210 | +0.050 |
| Nov 13 | 0.160 | +0.004 |
| Nov 12 | 0.156 | -0.004 |
| Nov 11 | 0.160 | +0.000 |
| Nov 10 | 0.160 | +0.000 |
| Nov 9 | 0.160 | +0.000 |
| Nov 8 | 0.160 | +0.000 |
| Nov 7 | 0.160 | -0.000 |
| Nov 6 | 0.160 | +0.000 |
| Nov 5 | 0.160 | -0.030 |
| Nov 4 | 0.190 | +0.020 |
| Nov 3 | 0.170 | +0.010 |
| Nov 2 | 0.160 | +0.000 |
| Nov 1 | 0.160 | -0.014 |
| Oct 31 | 0.174 | +0.000 |
| Oct 30 | 0.174 | -0.000 |
| Oct 29 | 0.174 | -0.005 |
| Oct 28 | 0.179 | — |
77 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Gulf Run TransmissionState only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
Recent notices on Gulf Run Transmission
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf Run Transmission notices →
Gulf Run Transmission · posted 2026-11-25 · effective 2026-12-02 · force majeure
Gulf Run Transmission has declared force majeure for unplanned maintenance at its Vernon Compressor Station in Jackson Parish, Louisiana (Zone 1), effective December 2, 2026 at 9:00 a.m. and anticipated to complete by December 3, 2026 at 9:00 a.m. During this one-day window, thro…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on Gulf Run Transmission
- Gemini Panola GR 0.381 Bcf/d
- ETC/HPL to GR 0.337 Bcf/d
- Enterprise Bulldog 0.305 Bcf/d
- Magnolia Gas - Keatchie 0.304 Bcf/d
- Midcoast DD to GR 0.243 Bcf/d
- Ajax Plant 0.210 Bcf/d
- CHK/LAMID-MANSFIELD 0.160 Bcf/d
- Magnolia GR 0.139 Bcf/d
Cite thisEnercast PipeScrape, North Holly (Gulf Run Transmission loc 293136) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfrun/293136/