Gas day Nov 27
0.135
Bcf/d scheduled
Δ Day-over-day
-0.025
vs Nov 26
7-day average
0.145
Bcf/d
30-day average
0.158
30 of 30 days posted
30-day high
0.245
Nov 3
30-day low
0.108
Nov 21
Operating capacity
0.500
Bcf/d as posted, none cycle
Utilization
27%
headroom 73%

Scheduled quantities as posted by Gulf Run Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.000.100.200.30Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.135-0.025
Nov 260.160+0.035
Nov 250.125-0.020
Nov 240.145-0.038
Nov 230.183+0.027
Nov 220.156+0.048
Nov 210.108-0.063
Nov 200.171+0.015
Nov 190.156-0.004
Nov 180.160+0.030
Nov 170.130-0.090
Nov 160.220+0.015
Nov 150.205-0.014
Nov 140.219+0.060
Nov 130.159+0.048
Nov 120.112+0.000
Nov 110.112-0.004
Nov 100.116+0.001
Nov 90.115+0.000
Nov 80.115+0.000
Nov 70.115-0.018
Nov 60.133+0.023
Nov 50.110-0.092
Nov 40.202-0.043
Nov 30.245+0.036
Nov 20.209-0.016
Nov 10.225+0.062
Oct 310.163+0.000
Oct 300.163+0.002
Oct 290.161—
78 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf Run Transmission

Gulf Run TransmissionState only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Gulf Run Transmission

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf Run Transmission notices →

Gulf Run Transmission · posted 2026-11-25 · effective 2026-12-02 · force majeure
Gulf Run Transmission has declared force majeure for unplanned maintenance at its Vernon Compressor Station in Jackson Parish, Louisiana (Zone 1), effective December 2, 2026 at 9:00 a.m. and anticipated to complete by December 3, 2026 at 9:00 a.m. During this one-day window, thro…