Gas day Nov 27
0.247
Bcf/d scheduled
Δ Day-over-day
+0.024
vs Nov 26
7-day average
0.226
Bcf/d
30-day average
0.251
30 of 30 days posted
30-day high
0.275
Nov 18
30-day low
0.208
Nov 19
Operating capacity
0.400
Bcf/d as posted, none cycle
Utilization
62%
headroom 38%
Scheduled quantities as posted by Gulf Run Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.247 | +0.024 |
| Nov 26 | 0.223 | +0.000 |
| Nov 25 | 0.223 | -0.010 |
| Nov 24 | 0.233 | +0.010 |
| Nov 23 | 0.223 | +0.000 |
| Nov 22 | 0.223 | +0.013 |
| Nov 21 | 0.210 | -0.023 |
| Nov 20 | 0.233 | +0.025 |
| Nov 19 | 0.208 | -0.066 |
| Nov 18 | 0.275 | +0.000 |
| Nov 17 | 0.275 | +0.028 |
| Nov 16 | 0.246 | -0.028 |
| Nov 15 | 0.274 | +0.001 |
| Nov 14 | 0.274 | +0.022 |
| Nov 13 | 0.252 | -0.012 |
| Nov 12 | 0.264 | -0.007 |
| Nov 11 | 0.271 | +0.001 |
| Nov 10 | 0.270 | -0.001 |
| Nov 9 | 0.271 | +0.000 |
| Nov 8 | 0.271 | +0.000 |
| Nov 7 | 0.271 | -0.000 |
| Nov 6 | 0.271 | +0.000 |
| Nov 5 | 0.271 | +0.000 |
| Nov 4 | 0.271 | -0.004 |
| Nov 3 | 0.274 | +0.015 |
| Nov 2 | 0.260 | +0.000 |
| Nov 1 | 0.260 | +0.027 |
| Oct 31 | 0.233 | +0.000 |
| Oct 30 | 0.233 | +0.000 |
| Oct 29 | 0.233 | — |
78 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Gulf Run TransmissionState only (Louisiana) — the meter's exact site is not geocoded; the ring marks the state, not the point.
Notices
Recent notices on Gulf Run Transmission
Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf Run Transmission notices →
Gulf Run Transmission · posted 2026-11-25 · effective 2026-12-02 · force majeure
Gulf Run Transmission has declared force majeure for unplanned maintenance at its Vernon Compressor Station in Jackson Parish, Louisiana (Zone 1), effective December 2, 2026 at 9:00 a.m. and anticipated to complete by December 3, 2026 at 9:00 a.m. During this one-day window, thro…
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Supply / Production meters on Gulf Run Transmission
- Gemini Panola GR 0.381 Bcf/d
- ETC/HPL to GR 0.322 Bcf/d
- Enterprise Bulldog 0.306 Bcf/d
- Magnolia Gas - Keatchie 0.303 Bcf/d
- Midcoast DD to GR 0.254 Bcf/d
- North Holly 0.160 Bcf/d
- Magnolia GR 0.139 Bcf/d
- Regency @ Logansport 0.135 Bcf/d
Cite thisEnercast PipeScrape, Ajax Plant (Gulf Run Transmission loc 293123) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/gulfrun/293123/