Gas day Nov 26
0.030
Bcf/d scheduled
Δ Day-over-day
+0.005
vs Nov 25
7-day average
0.019
Bcf/d
30-day average
0.022
30 of 30 days posted
30-day high
0.049
Nov 12
30-day low
0.015
Nov 24
Operating capacity
0.100
Bcf/d as posted, none cycle
Utilization
30%
headroom 70%

Scheduled quantities as posted by Gulf Run Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0200.0400.060Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.030+0.005
Nov 250.025+0.010
Nov 240.015-0.001
Nov 230.016+0.000
Nov 220.016+0.000
Nov 210.016+0.000
Nov 200.016+0.000
Nov 190.016-0.014
Nov 180.030+0.014
Nov 170.016+0.000
Nov 160.016+0.000
Nov 150.016+0.000
Nov 140.016+0.000
Nov 130.016-0.034
Nov 120.049+0.000
Nov 110.049+0.034
Nov 100.016-0.010
Nov 90.026+0.000
Nov 80.026+0.000
Nov 70.026+0.003
Nov 60.023+0.004
Nov 50.018+0.000
Nov 40.018+0.000
Nov 30.018+0.001
Nov 20.018+0.000
Nov 10.018-0.009
Oct 310.027+0.000
Oct 300.027+0.000
Oct 290.027+0.001
Oct 280.025—
77 more days on file for this meter, back to August 12, 2026. Full meter-level history is part of Institutional (API and downloads).
Gulf Run Transmission

Gulf Run TransmissionState only (Texas) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Gulf Run Transmission

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Gulf Run Transmission notices →

Gulf Run Transmission · posted 2026-11-25 · effective 2026-12-02 · force majeure
Gulf Run Transmission has declared force majeure for unplanned maintenance at its Vernon Compressor Station in Jackson Parish, Louisiana (Zone 1), effective December 2, 2026 at 9:00 a.m. and anticipated to complete by December 3, 2026 at 9:00 a.m. During this one-day window, thro…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Marlin Midstream (Gulf Run Transmission loc 220025) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/gulfrun/220025/