Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Kleen Energy

Algonquin Gas Transmission · Loc 00833
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.052
Bcf/d scheduled
Δ Day-over-day
-0.033
vs Nov 26
7-day average
0.081
Bcf/d
30-day average
0.083
30 of 30 days posted
30-day high
0.098
Nov 17
30-day low
0.050
Nov 12
Operating capacity
0.226
Bcf/d as posted, late_0005 cycle
Utilization
23%
headroom 77%

Scheduled quantities as posted by Algonquin Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.052-0.033
Nov 260.085+0.003
Nov 250.082-0.004
Nov 240.086-0.007
Nov 230.093+0.005
Nov 220.088+0.005
Nov 210.083-0.013
Nov 200.096+0.004
Nov 190.092+0.007
Nov 180.085-0.013
Nov 170.098+0.012
Nov 160.086-0.009
Nov 150.095+0.003
Nov 140.092+0.023
Nov 130.069+0.019
Nov 120.050-0.026
Nov 110.076-0.014
Nov 100.090+0.002
Nov 90.088+0.007
Nov 80.081+0.000
Nov 70.081-0.009
Nov 60.090+0.003
Nov 50.087-0.001
Nov 40.088+0.006
Nov 30.082+0.000
Nov 20.082+0.004
Nov 10.078-0.007
Oct 310.085+0.018
Oct 300.067-0.006
Oct 290.073—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Algonquin Gas TransmissionKleen Energy

Algonquin Gas TransmissionPlant location from EIA Form 860 (plant 56798).

Recent notices on Algonquin Gas Transmission

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Algonquin Gas Transmission notices →

Algonquin Gas Transmission · posted 2026-11-25 · effective 2026-11-27 · informational
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · compressor issue
Algonquin Gas Transmission experienced an unplanned outage at its Weymouth, MA compressor station on Gas Day October 16, 2026. South-to-North nominations through Weymouth will be reduced to 20,000 Dth/d (0.020 Bcf/d) on October 17, then cut to zero beginning October 18 through th…
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · force majeure
Algonquin Gas Transmission declared a force majeure on October 16, 2026 due to an unplanned outage at its Weymouth compressor station in the Boston/New England delivery region. The compressor station is expected to be returned to service by Gas Day October 23, 2026, a duration of…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Kleen Energy (Algonquin Gas Transmission loc 00833) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/algonquin/00833/