Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Ocean St (PROVIDENCE,RI)

Algonquin Gas Transmission · Loc 00095
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.103
Bcf/d scheduled
Δ Day-over-day
+0.068
vs Nov 26
7-day average
0.041
Bcf/d
30-day average
0.017
30 of 30 days posted
30-day high
0.103
Nov 27
30-day low
0.000
Nov 24
Operating capacity
0.236
Bcf/d as posted, late_0005 cycle
Utilization
44%
headroom 56%

Scheduled quantities as posted by Algonquin Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.103+0.068
Nov 260.035-0.002
Nov 250.038+0.038
Nov 240.000-0.041
Nov 230.041+0.005
Nov 220.036-0.000
Nov 210.036+0.036
Nov 200.000-0.023
Nov 190.023-0.028
Nov 180.050+0.050
Nov 170.000-0.052
Nov 160.052+0.008
Nov 150.044-0.006
Nov 140.050+0.050
Nov 130.000-0.004
Nov 120.004-0.002
Nov 110.006+0.006
Nov 100.000+0.000
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000+0.000
Nov 60.000+0.000
Nov 50.000+0.000
Nov 40.000+0.000
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000-0.002
Oct 310.002+0.002
Oct 300.000+0.000
Oct 290.000—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Algonquin Gas TransmissionOcean St (PROVIDENCE,RI)

Algonquin Gas TransmissionPlant location from EIA Form 860 (plant 51030).

Recent notices on Algonquin Gas Transmission

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Algonquin Gas Transmission notices →

Algonquin Gas Transmission · posted 2026-11-25 · effective 2026-11-27 · informational
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · compressor issue
Algonquin Gas Transmission experienced an unplanned outage at its Weymouth, MA compressor station on Gas Day October 16, 2026. South-to-North nominations through Weymouth will be reduced to 20,000 Dth/d (0.020 Bcf/d) on October 17, then cut to zero beginning October 18 through th…
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · force majeure
Algonquin Gas Transmission declared a force majeure on October 16, 2026 due to an unplanned outage at its Weymouth compressor station in the Boston/New England delivery region. The compressor station is expected to be returned to service by Gas Day October 23, 2026, a duration of…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Ocean St (PROVIDENCE,RI) (Algonquin Gas Transmission loc 00095) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/algonquin/00095/