Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Dynegy Lake Road (Windham,CT)

Algonquin Gas Transmission · Loc 00817
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.212
Bcf/d scheduled
Δ Day-over-day
+0.088
vs Nov 26
7-day average
0.132
Bcf/d
30-day average
0.122
30 of 30 days posted
30-day high
0.212
Nov 27
30-day low
0.103
Oct 31
Operating capacity
0.236
Bcf/d as posted, late_0005 cycle
Utilization
90%
headroom 10%

Scheduled quantities as posted by Algonquin Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.100.200.30Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.212+0.088
Nov 260.124+0.020
Nov 250.105-0.001
Nov 240.105-0.020
Nov 230.125+0.000
Nov 220.125-0.003
Nov 210.128+0.003
Nov 200.125+0.017
Nov 190.108-0.005
Nov 180.113+0.003
Nov 170.110-0.001
Nov 160.111-0.010
Nov 150.121-0.004
Nov 140.125+0.001
Nov 130.124+0.016
Nov 120.108-0.018
Nov 110.125+0.008
Nov 100.118-0.007
Nov 90.125-0.001
Nov 80.125+0.000
Nov 70.125+0.003
Nov 60.122-0.003
Nov 50.125+0.001
Nov 40.124-0.006
Nov 30.130+0.005
Nov 20.125+0.010
Nov 10.115+0.013
Oct 310.103-0.003
Oct 300.105-0.012
Oct 290.117—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Algonquin Gas TransmissionDynegy Lake Road (Windham,CT)

Algonquin Gas TransmissionPlant location from EIA Form 860 (plant 55149).

Recent notices on Algonquin Gas Transmission

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Algonquin Gas Transmission notices →

Algonquin Gas Transmission · posted 2026-11-25 · effective 2026-11-27 · informational
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · compressor issue
Algonquin Gas Transmission experienced an unplanned outage at its Weymouth, MA compressor station on Gas Day October 16, 2026. South-to-North nominations through Weymouth will be reduced to 20,000 Dth/d (0.020 Bcf/d) on October 17, then cut to zero beginning October 18 through th…
Algonquin Gas Transmission · posted 2026-10-30 · effective 2026-10-16 · force majeure
Algonquin Gas Transmission declared a force majeure on October 16, 2026 due to an unplanned outage at its Weymouth compressor station in the Boston/New England delivery region. The compressor station is expected to be returned to service by Gas Day October 23, 2026, a duration of…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Dynegy Lake Road (Windham,CT) (Algonquin Gas Transmission loc 00817) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/algonquin/00817/