November 2026, by week · month overview
All
Force Majeure
Maintenance
Capacity
Compressor
Sev 4–5 Only
Operational Alert
Until Further Notice
1 Days
Gulf South Pipeline issued a Critical Over-Under Performance notice for Gas Day 11/26/2026 citing a customer's failure to take confirmed quantities at Loc 24329 Stratton Ridge to Freeport LNG. Gulf South anticipates scheduling reductions for the remaining nomination cycles for Gas Day 11/26/2026 and until further notice. This is a recurrence of the same curtailment pattern seen on Gas Day 11/2/2026 (GSPL-5038951); pre-event baseline at Loc 24329 was approximately 1.47-1.50 Bcf/d (median 1.47 Bcf/d) over the prior seven days through 11/25/2026, with live capacity data showing 1.48 Bcf/d scheduled against 1.78 Bcf/d operating capacity (83.4% utilized) as of the td3 cycle on 11/26/2026.
Freeport LNG feed gas curtailment at Stratton Ridge (Loc 24329) recurs for Gas Day 11/26/2026 UFN; pre-event scheduled flow was ~1.47 Bcf/d (range 1.47-1.50 Bcf/d over the prior week) -- displaced volumes remain in the domestic Gulf Coast supply pool, bearish for Henry Hub regional basis.
Reroute: None: Freeport LNG is an export terminal; gas that cannot be taken by the LNG customer stays in the domestic market and cannot be rerouted to the terminal via an alternative path if the terminal itself is failing to take.
View original notice text Loading…
Operational Alert
Until Further Notice
CPL has reissued a Critical Operational Alert (PPO subcategory) for Cove Point LNG under new notice ID CPL-1012889, replacing the prior posting CPL-1012597 from 2026-11-10 with no change in operational content. No curtailment volume or restoration timeline is stated. Pre-event feedgas delivery at COVE POINT PLANT (loc 10001 D:DPQ) remains running at approximately 0.858 Bcf/d against an operating capacity of 0.920 Bcf/d (93.2% utilized, 0.062 Bcf/d headroom) as of the 2026-11-25 evening cycle, consistent with the ~0.86 Bcf/d baseline observed over the prior week.
Cove Point LNG critical operational alert remains in effect with feedgas delivery at ~0.858 Bcf/d (93.2% of 0.920 Bcf/d operating capacity, only 0.062 Bcf/d headroom) -- any further reduction is bearish Appalachian supply demand and bearish the LNG export arb; no new market signal in this repost.
Reroute: None: Cove Point LNG is a fixed export terminal; feedgas supply disruptions cannot be rerouted to an alternative export outlet.
View original notice text Loading…
Force Majeure
0.500 Bcf/d cut (capped at 1.949 Bcf/d)
Southern Natural Gas declared force majeure effective gas day November 22, 2026 due to an unscheduled pipeline outage on the South Main Loop Line east of the York compressor station (Segment 440, Zone 1/2 S Boundary) in Sumter County, AL. Capacity on Segment 440 is reduced by 500 MDth/d (0.500 Bcf/d) to 1,949 MDth/d, with return to service currently unknown and no end date provided. Interruptible and Out of Path nominations may be restricted, and Primary In the Path service is at risk if demand increases.
SNG force majeure removes 0.500 Bcf/d from Segment 440 (Zone 1/2 S Boundary) until further notice, tightening Gulf Coast northbound supply into the Southeast and putting primary firm service at risk; expect bullish pressure on Southern Natural La. and Transco Zone 4 Southeast basis.
Reroute: Limited: Transco serves overlapping Southeast markets but SNG (Southern Natural Gas) is one of the two dominant Gulf Coast-to-Southeast pipelines; a 0.500 Bcf/d firm-at-risk outage with no restoration timeline limits offset options, and SNG is not monitored in real time by this system.
View original notice text Loading…
El Paso Natural Gas (EPNG)
[OPERATIONAL FLOW ORDER] SOC Declaration - Location Specific Pack
SEV 3/5
Informational
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
NEXUS Gas Transmission (U.S.)
Meter N1002 Unplanned Outage -- UPDATE
SEV 3/5
Informational
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf Run Transmission
[Gulf Run Transmission] [Maintenance] Vernon FMJ
SEV 3/5
Force Majeure
capped at 1.200 Bcf/d, cut unknown
Until Further Notice
1 Days
Gulf Run Transmission has declared force majeure for unplanned maintenance at its Vernon Compressor Station in Jackson Parish, Louisiana (Zone 1), effective December 2, 2026 at 9:00 a.m. and anticipated to complete by December 3, 2026 at 9:00 a.m. During this one-day window, throughput at Vernon will be capped at 1.2 Bcf/d; Gulf Run states it does not anticipate impacts to primary firm service based on current nominations, but will evaluate on a case-by-case basis.
Gulf Run FM caps Vernon CS at 1.2 Bcf/d for one day (Dec 2-3); pipeline states no primary firm impact anticipated, so the net cut versus current scheduled volumes appears small -- the Golden Pass Pipeline delivery point shows only 0.839 Bcf/d scheduled against 2.0 Bcf/d operating capacity today, suggesting the 1.2 Bcf/d ceiling does not bind under current nominations, though shippers should monitor intraday nominations closely.
Reroute: Limited: Gulf Run is a dedicated Haynesville-to-LNG takeaway pipeline primarily serving Golden Pass; Gulf South and other Haynesville-area pipes could absorb some producer volumes, but downstream Golden Pass feed gas has no direct reroute.
View original notice text Loading…
Northern Border Pipeline (NBPL)
Receipt Point Update, Underperformance / Low Inventory
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Algonquin Gas Transmission
AGT Operational Flow Order -- EFF 11/27 -- UPDATE
SEV 3/5
Informational
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Texas Eastern Transmission (TETCO)
TE Operational Flow Order -- UPDATE
SEV 3/5
Informational
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Algonquin Gas Transmission
AGT Operational Flow Order -- EFF 11/27
SEV 3/5
Informational
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Columbia Gulf Transmission (CGT)
Clementsville Compressor Station Maintenance, Effective December 1-4, 2026
SEV 3/5
Informational
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Deliver Confirmed Quantities at Location 23367
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gas Transmission Northwest
UPDATED: CAPACITY REDUCTION: GTN – Flow Past Kingsgate (Updated: 11/24/26)
SEV 3/5
Informational
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Northern Border Pipeline (NBPL)
Receipt Point Underperformance / Low Inventory
SEV 3/5
Informational
Until Further Notice
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Texas Eastern Transmission (TETCO)
TE Operational Flow Order -- EFF 11/25
SEV 3/5
Operational Alert
TETCO has issued a system-wide Operational Flow Order (OFO) effective 9:00 AM CCT November 25, 2026, covering Access Area Zones STX, ETX, ELA, and WLA as well as Market Area Zones M1-24 and M1-30, applicable to all OBA and Transportation Contracts except those under a FERC gas tariff. The OFO explicitly states it does not affect TETCO's ability to receive or deliver scheduled nomination quantities; it is a balance-discipline measure imposing a 5%/250 MMBtu tolerance with no-due-shipper restrictions, effective until further notice. M2 and M3 zones are under No Action Alert only, with no active OFO.
TETCO system OFO effective Nov 25 imposes shipper balance discipline across Gulf Coast supply zones (STX, ETX, WLA, ELA) and M1 market zones with UFN duration, but the notice explicitly states no impact on scheduled receipts or deliveries -- watch for escalation to hourly OFO or firm curtailment language, which would trigger a material basis move at TETCO STX and M-1 points; no immediate Henry Hub signal.
Reroute: Not applicable -- this OFO does not restrict capacity or scheduled volumes; it imposes imbalance penalties only.
View original notice text Loading…
Transwestern Pipeline
[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - OVERAGE ALERT - PHOENIX AREA
SEV 3/5
Informational
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Southern Natural Gas
[FORCE MAJEURE] Update #2 Unsched Outage SEG 440 York
SEV 3/5
Informational
Pre-screen severity 3 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO DAILYCD1 DS 245&321 LIFTED EFF 11-28
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Transwestern Pipeline
[Transwestern Pipeline] [Operational Alert] CRITICAL NOTICE - SAME DAY - UNDERAGE ALERT - PHOENIX AREA
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Rockies Express
[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR DECEMBER 2026 - UPDATE #2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Algonquin Gas Transmission
AGT Pipeline Conditions for 11/27/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Texas Eastern Transmission (TETCO)
TE Pipeline Conditions for 11/27/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
East Tennessee Natural Gas
ETNG Pipeline Conditions for 11/27/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Steckman Ridge
SR Storage Conditions for 11/27/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Southeast Supply Header
SESH Pipeline Conditions for 11/27/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
NEXUS Gas Transmission (U.S.)
NEXUS Pipeline Conditions for 11/27/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Iroquois Gas Transmission
Capacity Constraint
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tallgrass Energy
[Trailblazer Pipeline (TPC)] [MAINTENANCE] TRAILBLAZER MAINTENANCE SCHEDULE FOR DECEMBER 2026 - UPDATE #1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Texas Eastern Transmission (TETCO)
TE Pipeline Conditions for 11/26/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Algonquin Gas Transmission
AGT Pipeline Conditions for 11/26/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Iroquois Gas Transmission
Capacity Constraint
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
East Tennessee Natural Gas
ETNG Pipeline Conditions for 11/26/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Southeast Supply Header
SESH Pipeline Conditions for 11/26/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
NEXUS Gas Transmission (U.S.)
NEXUS Pipeline Conditions for 11/26/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Steckman Ridge
SR Storage Conditions for 11/26/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Texas Eastern Transmission (TETCO)
TE Meter Underperformance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Southern Natural Gas
[MAINTENANCE] Update Sched Outage Seg 340 White Castle
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso Natural Gas (EPNG)
[MAINTENANCE] Updated Prelim December 2026 Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
EGTS
November Due Pipe Imbalance Payback Postponed
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
ANR Pipeline (TC Energy)
UPDATED: CAPACITY REDUCTION Southeast Area – Fournerat Road Delivery
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
OFO DAILY CD1 FOR DS 245 & 321 EFF 11-26
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Maritimes & Northeast Canada
MNCA Operational Flow Order -- EFF 11/27
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Columbia Gas Transmission (TCO)
CAPACITY POSTING - TIM for November 26, 2026 through November 30, 2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Transco
Updated - Market and Production Constraints
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Rockies Express
[MAINTENANCE] REX MAINTENANCE SCHEDULE FOR DECEMBER 2026 - UPDATE #1
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
East Tennessee Natural Gas
ETNG Imbalance Notice -- UPDATE
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Northern Border Pipeline (NBPL)
Receipt Point Update, Underperformance / Low Inventory
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Algonquin Gas Transmission
AGT Pipeline Conditions for 11/25/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Southeast Supply Header
SESH Meter Underperformance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Texas Eastern Transmission (TETCO)
TE Pipeline Conditions for 11/25/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
East Tennessee Natural Gas
ETNG Pipeline Conditions for 11/25/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Southeast Supply Header
SESH Pipeline Conditions for 11/25/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
NEXUS Gas Transmission (U.S.)
NEXUS Pipeline Conditions for 11/25/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Steckman Ridge
SR Storage Conditions for 11/25/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Iroquois Gas Transmission
Capacity Constraint
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Columbia Gas Transmission (TCO)
Operational Alert – DT Midstream Stonewall Gas Gathering – Braxton (842867) - Force Majuere Lifted for GD 25
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Failure to Take Confirmed Quantities at Location 23367
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
EMERGENT REPAIR AT STA 542 2A RESOLVED
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Columbia Gas Transmission (TCO)
CAPACITY POSTING - TIM for November 25, 2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Natural Gas Pipeline (NGPL)
[FORCE MAJEURE] FORCE MAJEURE - COMP STA 168 - LIFTED
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Iroquois Gas Transmission
Capacity Constraint
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Iroquois Gas Transmission
Capacity Constraint
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Iroquois Gas Transmission
Capacity Constraint
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Algonquin Gas Transmission
AGT Pipeline Conditions for 11/24/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Texas Eastern Transmission (TETCO)
TE Pipeline Conditions for 11/24/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
East Tennessee Natural Gas
ETNG Pipeline Conditions for 11/24/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Steckman Ridge
SR Storage Conditions for 11/24/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Southeast Supply Header
SESH Pipeline Conditions for 11/24/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
NEXUS Gas Transmission (U.S.)
NEXUS Pipeline Conditions for 11/24/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso Natural Gas (EPNG)
[MAINTENANCE] Updated November 2026 Maintenance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Great Lakes Gas Transmission
MAINTENANCE SCHEDULE for Great Lakes Gas Transmission (Posted: 11/23/26)
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf Run Transmission
[Gulf Run Transmission] [Maintenance] Westdale Planned Maintenance Cancellation
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Algonquin Gas Transmission
AGT Operational Flow Order -- EFF 11/24
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Trunkline Gas Company
[Trunkline Gas Company] [Maintenance] TGC Edna 100-1 & Cypress 100-1 Line Pigging Update #2
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Columbia Gas Transmission (TCO)
CAPACITY POSTING - TIM for November 24, 2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Transco
Pipeline Conditions
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Transco
Operational Flow Order - Imbalance
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Transco
Updated - Market and Production Constraints
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Force Majeure
0.270 Bcf/d cut (capped at 2.179 Bcf/d)
1 Days
Southern Natural Gas declared force majeure on Segment 440 (Zone 1/2 S Boundary) east of the York compressor station in Sumter County, AL following an unscheduled pipeline outage on November 22, 2026. This Update #1 (superseding notice #712677) quantifies the capacity reduction at 270 Mdth/d, bringing operating capacity from 2,449 Mdth/d down to 2,179 Mdth/d effective the Timely cycle gas day Monday November 23. SNG states no anticipated nomination impact based on current nominations, with the event window ending November 23 at 9:00 AM.
SNG force majeure on Segment 440 removes 0.27 Bcf/d of Southeast mainline capacity, but with no anticipated curtailment impact per current nominations, basis widening at Transco Zone 4 or Henry Hub is unlikely unless demand or nominations shift before restoration.
Reroute: Moderate: Transco serves overlapping Southeast markets, though SNG and Transco are the two dominant Southeast pipelines and SNG's real-time condition leaves limited confirmed alternatives; the small size of this cut (0.27 Bcf/d) and stated no-impact assessment suggest reroute is not needed at this time.
View original notice text Loading…
Algonquin Gas Transmission
AGT Pipeline Conditions for 11/23/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tres Palacios Gas Storage
TPGS Storage Conditions for 11/23/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
East Tennessee Natural Gas
ETNG Pipeline Conditions for 11/23/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Texas Eastern Transmission (TETCO)
TE Pipeline Conditions for 11/23/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Steckman Ridge
SR Storage Conditions for 11/23/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Southeast Supply Header
SESH Pipeline Conditions for 11/23/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
NEXUS Gas Transmission (U.S.)
NEXUS Pipeline Conditions for 11/23/2026
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Tennessee Gas Pipeline (TGP)
NO ANT PIP REST SEG 490 FH EFF 11-23-26
SEV 2/5
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
El Paso Natural Gas (EPNG)
[OPERATIONAL FLOW ORDER] SOC Lifted - Location Specific Pack
SEV 2/5
lifted ✓
Informational
Pre-screen severity 2 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Northern Border Pipeline (NBPL)
LIFTED: Receipt Point Update, Underperformance / Low Inventory
SEV 1/5
lifted ✓
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Texas Eastern Transmission (TETCO)
TE Operational Flow Order -- LIFTED (M1-24 and M2-24)
SEV 1/5
lifted ✓
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Posted Maintenance Events for 11/27/2026- 12/03/2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Natural Gas Pipeline (NGPL)
[MAINTENANCE] OUTAGE IMPACT REPORT 11-25-26
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
EGTS
System Alert – Transportation Due Shipper Imbalances
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Wyoming Interstate
[MAINTENANCE] Operations Planning Report V3 Dec 2026
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Columbia Gulf Transmission (CGT)
CAPACITY POSTING - TIM for November 26, 2026 through November 30, 2026
UNSCORED
Informational
View original notice text Loading…
Transco
Pipeline Conditions
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Northwest Pipeline
Mill Creek Erosion - Maintenance Completed
UNSCORED
Informational
View original notice text Loading…
El Paso Natural Gas (EPNG)
[MAINTENANCE] Updated Prelim December 2026 Maintenance
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Columbia Gulf Transmission (CGT)
Construction and Maintenance Schedule Posting
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Columbia Gas Transmission (TCO)
Construction and Maintenance Schedule Posting
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
MountainWest (multi-pipeline)
[MountainWest Overthrust Pipeline (MWOP)] [MOUNTAINWEST OVERTHRUST OFO] MOUNTAINWEST OVERTHRUST OFO
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
MountainWest (multi-pipeline)
[MountainWest Pipeline (MWP)] [MOUNTAINWEST PIPELINE OFO] MOUNTAINWEST PIPELINE OFO
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
CPL
Operationally Available Capacity for CPL inadvertently posted
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Corpus Christi LNG
CTPL Quorum Server Maintenance November 24, 2026, 10:15PM to November 25, 2026, 12:00AM
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Gulf South Pipeline
Airport Compressor Station Maintenance
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Southern Natural Gas
[FORCE MAJEURE] LIFTED FMJ - BBT ALTN #49433
SEV 1/5
lifted ✓
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Columbia Gulf Transmission (CGT)
CAPACITY POSTING - TIM for November 25, 2026
UNSCORED
Informational
View original notice text Loading…
El Paso Natural Gas (EPNG)
[MAINTENANCE] Updated November 2026 Maintenance
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
CPL
Operationally Available Capacity for CPL inadvertently posted
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Southern Star
System Conditions Update
SEV 1/5
Informational
Pre-screen severity 1 -- below full-score threshold.
Below alert threshold -- no detailed analysis performed.
Reroute: Not assessed.
View original notice text Loading…
Columbia Gulf Transmission (CGT)
CAPACITY POSTING - TIM for November 24, 2026
UNSCORED
Informational
View original notice text Loading…