Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

SANTAN PLANT

Transwestern Pipeline · Loc 78496
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.075
Bcf/d scheduled
Δ Day-over-day
-0.015
vs Nov 26
7-day average
0.072
Bcf/d
30-day average
0.055
30 of 30 days posted
30-day high
0.092
Oct 29
30-day low
0.010
Nov 3
Operating capacity
0.203
Bcf/d as posted, evening cycle
Utilization
37%
headroom 63%

Scheduled quantities as posted by Transwestern Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.075-0.015
Nov 260.090-0.002
Nov 250.091+0.015
Nov 240.076+0.015
Nov 230.061-0.007
Nov 220.069+0.030
Nov 210.039-0.005
Nov 200.044+0.015
Nov 190.030-0.046
Nov 180.076+0.025
Nov 170.051+0.005
Nov 160.047-0.024
Nov 150.071+0.019
Nov 140.052+0.000
Nov 130.052-0.005
Nov 120.057-0.016
Nov 110.073+0.014
Nov 100.059-0.006
Nov 90.065-0.003
Nov 80.067+0.013
Nov 70.055+0.013
Nov 60.041+0.030
Nov 50.011+0.000
Nov 40.011+0.001
Nov 30.010-0.013
Nov 20.023-0.014
Nov 10.038-0.017
Oct 310.054-0.017
Oct 300.071-0.021
Oct 290.092—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Transwestern PipelineSANTAN PLANT

Transwestern PipelinePlant location from EIA Form 860 (plant 8068).

Recent notices on Transwestern Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transwestern Pipeline notices →

Transwestern Pipeline · posted 2026-11-19 · effective 2026-11-19 · force majeure
Transwestern Pipeline declared force majeure effective November 19, 2026 at 7:15AM due to a compressor station mechanical failure on the West Texas Lateral. Lateral capacity is reduced from 0.830 Bcf/d to 0.750 Bcf/d, a net cut of 0.080 Bcf/d, through November 21, 2026 at 8:59AM.…
Transwestern Pipeline · posted 2026-11-17 · effective 2026-11-14 · informational
Transwestern Pipeline · posted 2026-11-16 · effective 2026-11-14 · force majeure
Transwestern Pipeline has extended its Force Majeure at the WT-0 Compressor Station (Hagerman, NM) from the originally posted single-day event (Gas Day Nov 15 only) through Gas Day November 17, 2026, now spanning three gas days. The mechanical failure reduces West Texas Lateral c…
Transwestern Pipeline · posted 2026-11-15 · effective 2026-11-14 · force majeure
Transwestern Pipeline declared a force majeure on Gas Day November 15, 2026 due to a mechanical failure at the WT-0 Compressor Station in Hagerman, NM, reducing West Texas Lateral capacity from 830,000 MMBtu/d (0.830 Bcf/d) to approximately 750,000 MMBtu/d (0.750 Bcf/d), a net cu…
Transwestern Pipeline · posted 2026-11-04 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27 due to compressor station mechanical failure, has been extended again through Nov 9, 2026 (Revision 2). Capacity remains reduced from 750,000 MMBtu/d to 630,000 MMBtu/d (0.120 Bcf/d net cut), with restoration no…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-11-03 · force majeure
Transwestern Pipeline declared a force majeure due to a compressor station mechanical failure west of Thoreau, reducing westbound capacity from 1.240 Bcf/d to 1.100 Bcf/d (a net cut of 0.140 Bcf/d) effective Gas Day November 3, 2026. The restriction is expected to remain in effec…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27, has been extended through November 5, 2026 (was Nov 3). East Mainline capacity remains restricted from 750,000 MMBtu/d to 630,000 MMBtu/d, a net reduction of 0.120 Bcf/d. Restoration to full 0.750 Bcf/d capacit…
Transwestern Pipeline · posted 2026-10-28 · effective 2026-10-24 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, SANTAN PLANT (Transwestern Pipeline loc 78496) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tw/78496/