Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Arlington Valley Plant

Transwestern Pipeline · Loc 100732
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.030
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.035
Bcf/d
30-day average
0.033
30 of 30 days posted
30-day high
0.046
Nov 11
30-day low
0.010
Oct 31
Operating capacity
0.250
Bcf/d as posted, evening cycle
Utilization
12%
headroom 88%

Scheduled quantities as posted by Transwestern Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.060Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.030+0.000
Nov 260.030+0.000
Nov 250.030-0.005
Nov 240.035-0.005
Nov 230.040+0.000
Nov 220.040+0.000
Nov 210.040+0.008
Nov 200.032-0.008
Nov 190.040+0.000
Nov 180.040+0.000
Nov 170.040+0.000
Nov 160.040+0.000
Nov 150.040+0.000
Nov 140.040+0.000
Nov 130.040+0.000
Nov 120.040-0.006
Nov 110.046+0.006
Nov 100.040+0.010
Nov 90.030+0.000
Nov 80.030+0.000
Nov 70.030+0.000
Nov 60.030+0.011
Nov 50.019-0.016
Nov 40.035-0.005
Nov 30.040+0.010
Nov 20.030+0.000
Nov 10.030+0.020
Oct 310.010+0.000
Oct 300.010+0.000
Oct 290.010—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Transwestern PipelineArlington Valley Plant

Transwestern PipelinePlant location from EIA Form 860 (plant 55282).

Recent notices on Transwestern Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transwestern Pipeline notices →

Transwestern Pipeline · posted 2026-11-19 · effective 2026-11-19 · force majeure
Transwestern Pipeline declared force majeure effective November 19, 2026 at 7:15AM due to a compressor station mechanical failure on the West Texas Lateral. Lateral capacity is reduced from 0.830 Bcf/d to 0.750 Bcf/d, a net cut of 0.080 Bcf/d, through November 21, 2026 at 8:59AM.…
Transwestern Pipeline · posted 2026-11-17 · effective 2026-11-14 · informational
Transwestern Pipeline · posted 2026-11-16 · effective 2026-11-14 · force majeure
Transwestern Pipeline has extended its Force Majeure at the WT-0 Compressor Station (Hagerman, NM) from the originally posted single-day event (Gas Day Nov 15 only) through Gas Day November 17, 2026, now spanning three gas days. The mechanical failure reduces West Texas Lateral c…
Transwestern Pipeline · posted 2026-11-15 · effective 2026-11-14 · force majeure
Transwestern Pipeline declared a force majeure on Gas Day November 15, 2026 due to a mechanical failure at the WT-0 Compressor Station in Hagerman, NM, reducing West Texas Lateral capacity from 830,000 MMBtu/d (0.830 Bcf/d) to approximately 750,000 MMBtu/d (0.750 Bcf/d), a net cu…
Transwestern Pipeline · posted 2026-11-04 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27 due to compressor station mechanical failure, has been extended again through Nov 9, 2026 (Revision 2). Capacity remains reduced from 750,000 MMBtu/d to 630,000 MMBtu/d (0.120 Bcf/d net cut), with restoration no…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-11-03 · force majeure
Transwestern Pipeline declared a force majeure due to a compressor station mechanical failure west of Thoreau, reducing westbound capacity from 1.240 Bcf/d to 1.100 Bcf/d (a net cut of 0.140 Bcf/d) effective Gas Day November 3, 2026. The restriction is expected to remain in effec…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27, has been extended through November 5, 2026 (was Nov 3). East Mainline capacity remains restricted from 750,000 MMBtu/d to 630,000 MMBtu/d, a net reduction of 0.120 Bcf/d. Restoration to full 0.750 Bcf/d capacit…
Transwestern Pipeline · posted 2026-10-28 · effective 2026-10-24 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Arlington Valley Plant (Transwestern Pipeline loc 100732) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tw/100732/