Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

DCP Artesia

Transwestern Pipeline · Loc 10703 · New Mexico
Processing plant · counted in Supply / Production
Gas day Nov 26
0.031
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.031
Bcf/d
30-day average
0.030
30 of 30 days posted
30-day high
0.031
Oct 30
30-day low
0.027
Nov 3
Operating capacity
0.038
Bcf/d as posted, evening cycle
Utilization
81%
headroom 19%

Scheduled quantities as posted by Transwestern Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

0.0000.0100.0200.0300.040Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.031+0.000
Nov 250.031+0.000
Nov 240.031+0.000
Nov 230.031+0.000
Nov 220.031+0.000
Nov 210.031+0.001
Nov 200.030-0.001
Nov 190.031+0.001
Nov 180.030+0.000
Nov 170.030+0.002
Nov 160.028-0.000
Nov 150.029-0.001
Nov 140.029-0.001
Nov 130.030+0.000
Nov 120.030+0.000
Nov 110.029-0.000
Nov 100.030+0.000
Nov 90.030+0.000
Nov 80.030+0.000
Nov 70.030+0.000
Nov 60.030+0.000
Nov 50.030+0.001
Nov 40.029+0.002
Nov 30.027-0.001
Nov 20.028+0.000
Nov 10.028-0.002
Oct 310.030-0.001
Oct 300.031+0.000
Oct 290.031+0.000
Oct 280.031—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Transwestern Pipeline

Transwestern PipelineState only (New Mexico) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Matched to this meter

Enercast’s scorer tied these notices to this exact posted point.

Transwestern Pipeline · posted 2026-10-19 · effective 2026-10-20 · force majeure
Transwestern Pipeline has declared a force majeure at Atoka 2 Compressor Station (Artesia area, NM) due to mechanical failure, effective Gas Day October 20, 2026. Total station capacity will be reduced from 75,000 MMBtu/d (0.075 Bcf/d) to approximately 35,000 MMBtu/d (0.035 Bcf/d…
Recent notices on Transwestern Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transwestern Pipeline notices →

Transwestern Pipeline · posted 2026-11-19 · effective 2026-11-19 · force majeure
Transwestern Pipeline declared force majeure effective November 19, 2026 at 7:15AM due to a compressor station mechanical failure on the West Texas Lateral. Lateral capacity is reduced from 0.830 Bcf/d to 0.750 Bcf/d, a net cut of 0.080 Bcf/d, through November 21, 2026 at 8:59AM.…
Transwestern Pipeline · posted 2026-11-17 · effective 2026-11-14 · informational
Transwestern Pipeline · posted 2026-11-16 · effective 2026-11-14 · force majeure
Transwestern Pipeline has extended its Force Majeure at the WT-0 Compressor Station (Hagerman, NM) from the originally posted single-day event (Gas Day Nov 15 only) through Gas Day November 17, 2026, now spanning three gas days. The mechanical failure reduces West Texas Lateral c…
Transwestern Pipeline · posted 2026-11-15 · effective 2026-11-14 · force majeure
Transwestern Pipeline declared a force majeure on Gas Day November 15, 2026 due to a mechanical failure at the WT-0 Compressor Station in Hagerman, NM, reducing West Texas Lateral capacity from 830,000 MMBtu/d (0.830 Bcf/d) to approximately 750,000 MMBtu/d (0.750 Bcf/d), a net cu…
Transwestern Pipeline · posted 2026-11-04 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27 due to compressor station mechanical failure, has been extended again through Nov 9, 2026 (Revision 2). Capacity remains reduced from 750,000 MMBtu/d to 630,000 MMBtu/d (0.120 Bcf/d net cut), with restoration no…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-11-03 · force majeure
Transwestern Pipeline declared a force majeure due to a compressor station mechanical failure west of Thoreau, reducing westbound capacity from 1.240 Bcf/d to 1.100 Bcf/d (a net cut of 0.140 Bcf/d) effective Gas Day November 3, 2026. The restriction is expected to remain in effec…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27, has been extended through November 5, 2026 (was Nov 3). East Mainline capacity remains restricted from 750,000 MMBtu/d to 630,000 MMBtu/d, a net reduction of 0.120 Bcf/d. Restoration to full 0.750 Bcf/d capacit…
Transwestern Pipeline · posted 2026-10-28 · effective 2026-10-24 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, DCP Artesia (Transwestern Pipeline loc 10703) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tw/10703/