[Transwestern Pipeline] [Force Majeure] Force Majeure - Atoka 2 Compressor Station (Artesia Area, NM).Gas Day 10/20/26

SEV 4/5Force Majeure0.040 Bcf/d cut (capped at 0.035 Bcf/d)1 days
Summary
Transwestern Pipeline has declared a force majeure at Atoka 2 Compressor Station (Artesia area, NM) due to mechanical failure, effective Gas Day October 20, 2026. Total station capacity will be reduced from 75,000 MMBtu/d (0.075 Bcf/d) to approximately 35,000 MMBtu/d (0.035 Bcf/d), a reduction of ~0.040 Bcf/d, affecting receipt volumes from DCP Artesia Plant (POI 10703) and Dagger Draw Plant (POI 56339). Transwestern states capacity will return to 75,000 MMBtu/d on Gas Day October 21, making this a single-day event.
Trading note
TW force majeure removes ~0.040 Bcf/d of Artesia-area Permian receipt capacity for Gas Day Oct 20 only; pre-event DCP Artesia (loc 10703) was scheduling ~0.031 Bcf/d against 0.038 Bcf/d operating capacity and Dagger Draw (loc 56339) was scheduling ~0.050 Bcf/d, so the combined receipts at risk broadly align with the stated cut -- expect modest bearish pressure at Waha/Permian basis with negligible downstream SoCal Border impact given the small aggregate volume and single-day duration.
Reroute potential
Limited: Transwestern and EPNG both serve the SoCal border from Permian receipt points; EPNG could absorb marginal volumes from Artesia-area producers, but at 0.040 Bcf/d the cut is small enough that system-wide reroute impact is minimal. The one-day duration further limits market significance.

Get alerts like this, free

Enercast Pipe Monitor tracks critical notices on 190+ U.S. interstate pipelines and scores each one for severity, capacity impact and basis direction. Free subscribers get Severity 4–5 notices by email or Telegram; Pro subscribers get every notice in real time.

View original notice text (as posted by Transwestern Pipeline)
Pipeline: Transwestern Pipeline
Notice ID: 121379
Notice Type: Force Majeure
Subject: Force Majeure - Atoka 2 Compressor Station (Artesia Area, NM).Gas Day 10/20/26
Posted: Oct 19 2026 9:40AM
Effective: Oct 20 2026 9:00AM
End Date: Oct 21 2026 8:59AM

Notice Type Description: Force Majeure
Notice Identifier: 121379
Critical Notice Description: Critical notice
Posting Date/Time: Oct 19 2026 9:40AM
Notice Status Description: Supersede
Required Response Indicator Description: No response required
TSP: 7933047
TSP Name: TRANSWESTERN PIPELINE COMPANY, LLC
Subject: Force Majeure - Atoka 2 Compressor Station (Artesia Area, NM).Gas Day 10/20/26
Notice Effective Date/Time: Oct 20 2026 9:00AM
Notice End Date/Time: Oct 21 2026 8:59AM
Notice Text: October 19, 2026To: All Transwestern CustomersSubject: Force Majeure - Atoka 2 Compressor Station (Artesia Area, NM).Reason: Atoka 2 Compressor Station has experienced a mechanical failure.This Force Majeure event will affect receipt volumes from the DCP Artesia Plant POI 10703 and the Dagger Draw Plant POI 56339.Gas Day October 20th, 2026Total capacity for Atoka 2 Compressor Station will be reduced from 75,000 MMBtu/d to approximately 35,000 MMBtu/d.Gas Day October 21st, 2026Total capacity for Atoka2 Compressor Station will increase from 35,000 MMBtu/d to 75,000 MMBtu/d.Transwestern reserves the right to revise the above listed schedule. Please continue to monitor Transwestern's website for updates and schedule changes.
Cite this Enercast Pipe Monitor, “[Transwestern Pipeline] [Force Majeure] Force Majeure - Atoka 2 Compressor Station (Artesia Area, NM).Gas Day 10/20/26” (Transwestern Pipeline), posted 2026-10-19. https://enercast.com/notice/transwestern-pipeline-tw-121379-r1.html
ID: TW-121379  |  Rev. 1  |  Posted: 2026-10-19 14:40  |  Direction: Bullish All Transwestern Pipeline notices  ·  page generated 2026-10-19 14:43 UTC