Enercast — at the moment it matters
Home / Daily Summary / Supply / Production / Meter

NMG RIO PUERCO BI-DIR

Transwestern Pipeline · Loc 60921 · New Mexico
Intrastate interconnect · counted in Supply / Production
Gas day Nov 26
-0.133
Bcf/d scheduled
Δ Day-over-day
+0.027
vs Nov 25
7-day average
-0.138
Bcf/d
30-day average
-0.096
30 of 30 days posted
30-day high
-0.056
Nov 13
30-day low
-0.160
Nov 24
Operating capacity
0.300
Bcf/d as posted, evening cycle
Utilization
44%
headroom 56%

Scheduled quantities as posted by Transwestern Pipeline on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Supply / Production page.

-0.20-0.15-0.10-0.05-0.00Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 26-0.133+0.027
Nov 25-0.160+0.001
Nov 24-0.160-0.008
Nov 23-0.152-0.018
Nov 22-0.135+0.000
Nov 21-0.135-0.045
Nov 20-0.090+0.022
Nov 19-0.112+0.009
Nov 18-0.121-0.035
Nov 17-0.086+0.012
Nov 16-0.098+0.004
Nov 15-0.102+0.003
Nov 14-0.104-0.049
Nov 13-0.056+0.013
Nov 12-0.069+0.000
Nov 11-0.069+0.016
Nov 10-0.085-0.020
Nov 9-0.065+0.000
Nov 8-0.065+0.000
Nov 7-0.065+0.015
Nov 6-0.080-0.004
Nov 5-0.076+0.004
Nov 4-0.080-0.004
Nov 3-0.077+0.012
Nov 2-0.089-0.028
Nov 1-0.061+0.043
Oct 31-0.104-0.031
Oct 30-0.073+0.011
Oct 29-0.083+0.004
Oct 28-0.088—
82 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Transwestern Pipeline

Transwestern PipelineState only (New Mexico) — the meter's exact site is not geocoded; the ring marks the state, not the point.

Recent notices on Transwestern Pipeline

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transwestern Pipeline notices →

Transwestern Pipeline · posted 2026-11-19 · effective 2026-11-19 · force majeure
Transwestern Pipeline declared force majeure effective November 19, 2026 at 7:15AM due to a compressor station mechanical failure on the West Texas Lateral. Lateral capacity is reduced from 0.830 Bcf/d to 0.750 Bcf/d, a net cut of 0.080 Bcf/d, through November 21, 2026 at 8:59AM.…
Transwestern Pipeline · posted 2026-11-17 · effective 2026-11-14 · informational
Transwestern Pipeline · posted 2026-11-16 · effective 2026-11-14 · force majeure
Transwestern Pipeline has extended its Force Majeure at the WT-0 Compressor Station (Hagerman, NM) from the originally posted single-day event (Gas Day Nov 15 only) through Gas Day November 17, 2026, now spanning three gas days. The mechanical failure reduces West Texas Lateral c…
Transwestern Pipeline · posted 2026-11-15 · effective 2026-11-14 · force majeure
Transwestern Pipeline declared a force majeure on Gas Day November 15, 2026 due to a mechanical failure at the WT-0 Compressor Station in Hagerman, NM, reducing West Texas Lateral capacity from 830,000 MMBtu/d (0.830 Bcf/d) to approximately 750,000 MMBtu/d (0.750 Bcf/d), a net cu…
Transwestern Pipeline · posted 2026-11-04 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27 due to compressor station mechanical failure, has been extended again through Nov 9, 2026 (Revision 2). Capacity remains reduced from 750,000 MMBtu/d to 630,000 MMBtu/d (0.120 Bcf/d net cut), with restoration no…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-11-03 · force majeure
Transwestern Pipeline declared a force majeure due to a compressor station mechanical failure west of Thoreau, reducing westbound capacity from 1.240 Bcf/d to 1.100 Bcf/d (a net cut of 0.140 Bcf/d) effective Gas Day November 3, 2026. The restriction is expected to remain in effec…
Transwestern Pipeline · posted 2026-11-02 · effective 2026-10-27 · force majeure
Transwestern East Mainline force majeure, originally declared Oct 27, has been extended through November 5, 2026 (was Nov 3). East Mainline capacity remains restricted from 750,000 MMBtu/d to 630,000 MMBtu/d, a net reduction of 0.120 Bcf/d. Restoration to full 0.750 Bcf/d capacit…
Transwestern Pipeline · posted 2026-10-28 · effective 2026-10-24 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, NMG RIO PUERCO BI-DIR (Transwestern Pipeline loc 60921) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tw/60921/