Gas day Nov 27
0.210
Bcf/d scheduled
Δ Day-over-day
+0.032
vs Nov 26
7-day average
0.191
Bcf/d
30-day average
0.164
30 of 30 days posted
30-day high
0.210
Nov 27
30-day low
0.125
Nov 11
Operating capacity
0.500
Bcf/d as posted, evening cycle
Utilization
42%
headroom 58%

Scheduled quantities as posted by Transco on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.100.200.30Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.210+0.032
Nov 260.178+0.013
Nov 250.165-0.035
Nov 240.200-0.000
Nov 230.201+0.010
Nov 220.191+0.000
Nov 210.191+0.041
Nov 200.149-0.010
Nov 190.160-0.001
Nov 180.160+0.001
Nov 170.159+0.001
Nov 160.159-0.005
Nov 150.164+0.000
Nov 140.164+0.004
Nov 130.159+0.009
Nov 120.150+0.025
Nov 110.125-0.000
Nov 100.125-0.035
Nov 90.160+0.010
Nov 80.150-0.010
Nov 70.160-0.005
Nov 60.165+0.005
Nov 50.160-0.001
Nov 40.161-0.005
Nov 30.166+0.001
Nov 20.165+0.020
Nov 10.145-0.016
Oct 310.161+0.000
Oct 300.161+0.005
Oct 290.156—
82 more days on file for this meter, back to August 8, 2026. Full meter-level history is part of Institutional (API and downloads).
TranscoBRUNSWICK / GREENSVILLE VAD MP 6.14

TranscoPlaced at the center of Brunswick, VA — approximate; the exact meter site is not published.

Recent notices on Transco

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transco notices →

Transco · posted 2026-11-06 · effective 2026-11-10 · informational