DELTA AGGREGATE MP 3.46

Transco · Loc 9010982
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.204
Bcf/d scheduled
Δ Day-over-day
+0.014
vs Nov 26
7-day average
0.194
Bcf/d
30-day average
0.115
30 of 30 days posted
30-day high
0.243
Nov 16
30-day low
0.000
Nov 10
Operating capacity
0.619
Bcf/d as posted, evening cycle
Utilization
33%
headroom 67%

Scheduled quantities as posted by Transco on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.100.200.30Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.204+0.014
Nov 260.190-0.016
Nov 250.205+0.005
Nov 240.201+0.027
Nov 230.173-0.013
Nov 220.186-0.015
Nov 210.201-0.017
Nov 200.218+0.033
Nov 190.185+0.015
Nov 180.170-0.025
Nov 170.195-0.048
Nov 160.243+0.021
Nov 150.223-0.006
Nov 140.229+0.034
Nov 130.195+0.071
Nov 120.124+0.077
Nov 110.047+0.047
Nov 100.000+0.000
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000+0.000
Nov 60.000+0.000
Nov 50.000+0.000
Nov 40.000+0.000
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000-0.082
Oct 300.082-0.090
Oct 290.172—
82 more days on file for this meter, back to August 8, 2026. Full meter-level history is part of Institutional (API and downloads).
TranscoDELTA AGGREGATE MP 3.46

TranscoPlaced at the center of York, PA — approximate; the exact meter site is not published.

Recent notices on Transco

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transco notices →

Transco · posted 2026-11-06 · effective 2026-11-10 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, DELTA AGGREGATE MP 3.46 (Transco loc 9010982) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/transco/9010982/