Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

FREEDOM METER STA M6343 MP 108.71

Transco · Loc 9009688
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.091
Bcf/d scheduled
Δ Day-over-day
+0.018
vs Nov 26
7-day average
0.076
Bcf/d
30-day average
0.054
30 of 30 days posted
30-day high
0.092
Nov 8
30-day low
0.000
Nov 20
Operating capacity
0.284
Bcf/d as posted, evening cycle
Utilization
32%
headroom 68%

Scheduled quantities as posted by Transco on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.091+0.018
Nov 260.073-0.003
Nov 250.075-0.007
Nov 240.083+0.005
Nov 230.078+0.010
Nov 220.068+0.001
Nov 210.067+0.067
Nov 200.000+0.000
Nov 190.000+0.000
Nov 180.000+0.000
Nov 170.000+0.000
Nov 160.000+0.000
Nov 150.000+0.000
Nov 140.000+0.000
Nov 130.000-0.013
Nov 120.013-0.010
Nov 110.022-0.053
Nov 100.076-0.007
Nov 90.082-0.010
Nov 80.092+0.010
Nov 70.082-0.002
Nov 60.084-0.001
Nov 50.084+0.002
Nov 40.082+0.004
Nov 30.079+0.005
Nov 20.074-0.008
Nov 10.082-0.001
Oct 310.083+0.005
Oct 300.078+0.000
Oct 290.077—
82 more days on file for this meter, back to August 8, 2026. Full meter-level history is part of Institutional (API and downloads).
TranscoFREEDOM METER STA M6343 MP 108.71

TranscoPlant location from EIA Form 860 (plant 59906).

Recent notices on Transco

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transco notices →

Transco · posted 2026-11-06 · effective 2026-11-10 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, FREEDOM METER STA M6343 MP 108.71 (Transco loc 9009688) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/transco/9009688/