Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

GAGE ROAD - ENERGY M7410 MP 1250.5

Transco · Loc 9009689
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.068
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.064
Bcf/d
30-day average
0.050
30 of 30 days posted
30-day high
0.086
Nov 7
30-day low
0.000
Nov 17
Operating capacity
0.131
Bcf/d as posted, evening cycle
Utilization
51%
headroom 49%

Scheduled quantities as posted by Transco on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.068+0.000
Nov 260.068+0.000
Nov 250.068-0.003
Nov 240.070+0.008
Nov 230.062+0.005
Nov 220.057+0.000
Nov 210.057-0.004
Nov 200.062+0.001
Nov 190.061+0.054
Nov 180.007+0.007
Nov 170.000+0.000
Nov 160.000+0.000
Nov 150.000+0.000
Nov 140.000+0.000
Nov 130.000+0.000
Nov 120.000+0.000
Nov 110.000+0.000
Nov 100.000-0.048
Nov 90.048-0.038
Nov 80.086-0.000
Nov 70.086+0.004
Nov 60.083+0.013
Nov 50.070-0.007
Nov 40.077+0.002
Nov 30.075+0.005
Nov 20.071-0.005
Nov 10.075-0.005
Oct 310.080+0.000
Oct 300.080+0.003
Oct 290.077—
82 more days on file for this meter, back to August 8, 2026. Full meter-level history is part of Institutional (API and downloads).
TranscoGAGE ROAD - ENERGY M7410 MP 1250.5

TranscoPlaced at the center of Cleveland, NC — approximate; the exact meter site is not published.

Recent notices on Transco

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transco notices →

Transco · posted 2026-11-06 · effective 2026-11-10 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, GAGE ROAD - ENERGY M7410 MP 1250.5 (Transco loc 9009689) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/transco/9009689/