Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

CHEROKEE COGEN M7334 MP 1234.08

Transco · Loc 9007482
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.050
Bcf/d scheduled
Δ Day-over-day
+0.032
vs Nov 26
7-day average
0.023
Bcf/d
30-day average
0.017
30 of 30 days posted
30-day high
0.050
Nov 27
30-day low
0.000
Oct 31
Operating capacity
0.103
Bcf/d as posted, evening cycle
Utilization
49%
headroom 51%

Scheduled quantities as posted by Transco on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.060Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.050+0.032
Nov 260.018+0.000
Nov 250.018+0.000
Nov 240.018+0.000
Nov 230.018-0.000
Nov 220.018+0.000
Nov 210.018+0.000
Nov 200.018-0.000
Nov 190.018+0.000
Nov 180.018-0.000
Nov 170.018+0.000
Nov 160.018+0.000
Nov 150.018+0.000
Nov 140.018+0.000
Nov 130.018+0.000
Nov 120.018+0.000
Nov 110.018-0.000
Nov 100.018+0.000
Nov 90.018+0.000
Nov 80.018+0.000
Nov 70.018+0.000
Nov 60.018+0.000
Nov 50.018+0.000
Nov 40.018-0.000
Nov 30.018-0.000
Nov 20.018+0.007
Nov 10.011+0.011
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000—
82 more days on file for this meter, back to August 8, 2026. Full meter-level history is part of Institutional (API and downloads).
TranscoCHEROKEE COGEN M7334 MP 1234.08

TranscoPlant location from EIA Form 860 (plant 55043).

Recent notices on Transco

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transco notices →

Transco · posted 2026-11-06 · effective 2026-11-10 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, CHEROKEE COGEN M7334 MP 1234.08 (Transco loc 9007482) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/transco/9007482/