Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

HILLABEE PWR M7380 MP 944.2

Transco · Loc 9004842
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.059
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.058
Bcf/d
30-day average
0.058
30 of 30 days posted
30-day high
0.060
Oct 30
30-day low
0.053
Oct 29
Operating capacity
0.284
Bcf/d as posted, evening cycle
Utilization
21%
headroom 79%

Scheduled quantities as posted by Transco on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.059+0.000
Nov 260.059+0.000
Nov 250.059+0.000
Nov 240.059+0.002
Nov 230.057+0.000
Nov 220.057+0.000
Nov 210.057+0.001
Nov 200.056-0.001
Nov 190.057-0.001
Nov 180.058-0.001
Nov 170.059+0.000
Nov 160.059+0.000
Nov 150.059+0.000
Nov 140.059+0.000
Nov 130.059+0.000
Nov 120.059-0.000
Nov 110.059+0.000
Nov 100.059+0.000
Nov 90.059+0.000
Nov 80.059+0.000
Nov 70.059+0.000
Nov 60.059+0.000
Nov 50.059+0.000
Nov 40.059+0.000
Nov 30.059-0.002
Nov 20.060+0.002
Nov 10.058+0.001
Oct 310.057-0.003
Oct 300.060+0.007
Oct 290.053—
82 more days on file for this meter, back to August 8, 2026. Full meter-level history is part of Institutional (API and downloads).
TranscoHILLABEE PWR M7380 MP 944.2

TranscoPlant location from EIA Form 860 (plant 55411).

Recent notices on Transco

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transco notices →

Transco · posted 2026-11-06 · effective 2026-11-10 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, HILLABEE PWR M7380 MP 944.2 (Transco loc 9004842) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/transco/9004842/