Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

MARSH RUN M7391 MP 1558.87

Transco · Loc 9001420
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.015
Bcf/d scheduled
Δ Day-over-day
-0.035
vs Nov 26
7-day average
0.029
Bcf/d
30-day average
0.056
30 of 30 days posted
30-day high
0.106
Nov 15
30-day low
0.015
Nov 27
Operating capacity
0.284
Bcf/d as posted, evening cycle
Utilization
5%
headroom 95%

Scheduled quantities as posted by Transco on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.015-0.035
Nov 260.050+0.017
Nov 250.032+0.001
Nov 240.031+0.013
Nov 230.018-0.000
Nov 220.018-0.020
Nov 210.039-0.003
Nov 200.042-0.016
Nov 190.058-0.019
Nov 180.077-0.022
Nov 170.099-0.006
Nov 160.105-0.001
Nov 150.106+0.003
Nov 140.103+0.033
Nov 130.070-0.024
Nov 120.094+0.013
Nov 110.081+0.017
Nov 100.064+0.004
Nov 90.060+0.041
Nov 80.019-0.035
Nov 70.053-0.021
Nov 60.074+0.026
Nov 50.048-0.006
Nov 40.054+0.008
Nov 30.045+0.003
Nov 20.043+0.004
Nov 10.039-0.001
Oct 310.040-0.018
Oct 300.058+0.005
Oct 290.053—
82 more days on file for this meter, back to August 8, 2026. Full meter-level history is part of Institutional (API and downloads).
TranscoMARSH RUN M7391 MP 1558.87

TranscoPlant location from EIA Form 860 (plant 7836).

Recent notices on Transco

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transco notices →

Transco · posted 2026-11-06 · effective 2026-11-10 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, MARSH RUN M7391 MP 1558.87 (Transco loc 9001420) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/transco/9001420/