Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

SEWAREN - PARKWAY M6033 MP 1804.85

Transco · Loc 1003320
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.011
Bcf/d scheduled
Δ Day-over-day
+0.011
vs Nov 26
7-day average
0.011
Bcf/d
30-day average
0.011
30 of 30 days posted
30-day high
0.029
Nov 21
30-day low
0.000
Nov 26
Operating capacity
0.048
Bcf/d as posted, evening cycle
Utilization
23%
headroom 77%

Scheduled quantities as posted by Transco on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0100.0200.030Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.011+0.011
Nov 260.000+0.000
Nov 250.000-0.009
Nov 240.009-0.009
Nov 230.018+0.008
Nov 220.010-0.019
Nov 210.029+0.014
Nov 200.014-0.006
Nov 190.020+0.002
Nov 180.018+0.001
Nov 170.017+0.017
Nov 160.000-0.019
Nov 150.019-0.006
Nov 140.025+0.025
Nov 130.000+0.000
Nov 120.000-0.008
Nov 110.008-0.005
Nov 100.013+0.003
Nov 90.010-0.000
Nov 80.010+0.000
Nov 70.010-0.017
Nov 60.026+0.026
Nov 50.000-0.004
Nov 40.004+0.004
Nov 30.000-0.008
Nov 20.008+0.000
Nov 10.007-0.007
Oct 310.014-0.001
Oct 300.015+0.001
Oct 290.014—
82 more days on file for this meter, back to August 8, 2026. Full meter-level history is part of Institutional (API and downloads).
TranscoSEWAREN - PARKWAY M6033 MP 1804.85

TranscoPlant location from EIA Form 860 (plant 2411).

Recent notices on Transco

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transco notices →

Transco · posted 2026-11-06 · effective 2026-11-10 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, SEWAREN - PARKWAY M6033 MP 1804.85 (Transco loc 1003320) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/transco/1003320/