Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

REMINGTON MP 1560.62

Transco · Loc 1003075
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.000
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.000
Bcf/d
30-day average
0.028
30 of 30 days posted
30-day high
0.075
Nov 15
30-day low
0.000
Nov 27
Operating capacity
0.600
Bcf/d as posted, evening cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Transco on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.000+0.000
Nov 260.000+0.000
Nov 250.000+0.000
Nov 240.000+0.000
Nov 230.000+0.000
Nov 220.000+0.000
Nov 210.000+0.000
Nov 200.000+0.000
Nov 190.000+0.000
Nov 180.000-0.050
Nov 170.050-0.020
Nov 160.070-0.005
Nov 150.075+0.025
Nov 140.050+0.005
Nov 130.045-0.005
Nov 120.050-0.005
Nov 110.055+0.010
Nov 100.045-0.024
Nov 90.069+0.049
Nov 80.020+0.000
Nov 70.020-0.050
Nov 60.070+0.050
Nov 50.020-0.030
Nov 40.050-0.000
Nov 30.050+0.010
Nov 20.040+0.025
Nov 10.015+0.005
Oct 310.010+0.000
Oct 300.010-0.020
Oct 290.030—
82 more days on file for this meter, back to August 8, 2026. Full meter-level history is part of Institutional (API and downloads).
TranscoREMINGTON MP 1560.62

TranscoPlant location from EIA Form 860 (plant 7838).

Recent notices on Transco

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Transco notices →

Transco · posted 2026-11-06 · effective 2026-11-10 · informational

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, REMINGTON MP 1560.62 (Transco loc 1003075) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/transco/1003075/