Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

Cane Run Power Generation Del

Texas Gas Transmission · Loc 9590
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.109
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.109
Bcf/d
30-day average
0.097
30 of 30 days posted
30-day high
0.109
Nov 4
30-day low
0.040
Oct 31
Operating capacity
0.164
Bcf/d as posted, eve cycle
Utilization
66%
headroom 34%

Scheduled quantities as posted by Texas Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.000.050.100.15Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.109+0.000
Nov 260.109+0.000
Nov 250.109+0.000
Nov 240.109-0.000
Nov 230.109+0.000
Nov 220.109+0.000
Nov 210.109+0.000
Nov 200.109+0.000
Nov 190.109+0.000
Nov 180.109+0.003
Nov 170.106+0.000
Nov 160.106+0.000
Nov 150.106+0.000
Nov 140.106-0.003
Nov 130.109+0.000
Nov 120.109+0.002
Nov 110.107+0.001
Nov 100.106-0.003
Nov 90.109+0.000
Nov 80.109+0.000
Nov 70.109+0.000
Nov 60.109+0.000
Nov 50.108-0.001
Nov 40.109+0.000
Nov 30.109+0.060
Nov 20.049+0.001
Nov 10.049+0.009
Oct 310.040+0.000
Oct 300.040+0.000
Oct 290.040—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Gas TransmissionCane Run Power Generation Del

Texas Gas TransmissionPlant location from EIA Form 860 (plant 1363).

No recent notices matched or named this point, and no severity 3+ notices on Texas Gas Transmission in the last 30 days. See all Texas Gas Transmission notices.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Cane Run Power Generation Del (Texas Gas Transmission loc 9590) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgt/9590/