Enercast — at the moment it matters
Home / Daily Summary / Power Generation / Meter

TVA-Lagoon Creek

Texas Gas Transmission · Loc 9588
Power plant delivery · counted in Power Generation
Gas day Nov 27
0.083
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.089
Bcf/d
30-day average
0.039
30 of 30 days posted
30-day high
0.096
Nov 24
30-day low
0.000
Nov 9
Operating capacity
0.400
Bcf/d as posted, eve cycle
Utilization
21%
headroom 79%

Scheduled quantities as posted by Texas Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.

0.0000.0250.0500.0750.100Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.083+0.000
Nov 260.083-0.009
Nov 250.091-0.005
Nov 240.096+0.005
Nov 230.091+0.000
Nov 220.091+0.000
Nov 210.091+0.000
Nov 200.091+0.020
Nov 190.071+0.012
Nov 180.059-0.014
Nov 170.074+0.033
Nov 160.041+0.000
Nov 150.040+0.003
Nov 140.038-0.009
Nov 130.046+0.006
Nov 120.041+0.004
Nov 110.037+0.032
Nov 100.005+0.005
Nov 90.000+0.000
Nov 80.000+0.000
Nov 70.000+0.000
Nov 60.000+0.000
Nov 50.000+0.000
Nov 40.000+0.000
Nov 30.000+0.000
Nov 20.000+0.000
Nov 10.000+0.000
Oct 310.000+0.000
Oct 300.000+0.000
Oct 290.000—
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Gas TransmissionTVA-Lagoon Creek

Texas Gas TransmissionPlant location from EIA Form 860 (plant 7845).

No recent notices matched or named this point, and no severity 3+ notices on Texas Gas Transmission in the last 30 days. See all Texas Gas Transmission notices.

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, TVA-Lagoon Creek (Texas Gas Transmission loc 9588) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgt/9588/