Gas day Nov 27
0.059
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.045
Bcf/d
30-day average
0.064
30 of 30 days posted
30-day high
0.122
Nov 2
30-day low
0.000
Nov 18
Operating capacity
0.276
Bcf/d as posted, eve cycle
Utilization
22%
headroom 78%
Scheduled quantities as posted by Texas Gas Transmission on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the Power Generation page.
Last 30 Gas Days
Show the 30-day table
| Gas day | Bcf/d | Δ DoD |
|---|---|---|
| Nov 27 | 0.059 | +0.000 |
| Nov 26 | 0.059 | +0.030 |
| Nov 25 | 0.030 | -0.079 |
| Nov 24 | 0.109 | +0.089 |
| Nov 23 | 0.020 | +0.000 |
| Nov 22 | 0.020 | +0.000 |
| Nov 21 | 0.020 | -0.089 |
| Nov 20 | 0.109 | +0.089 |
| Nov 19 | 0.020 | +0.020 |
| Nov 18 | 0.000 | +0.000 |
| Nov 17 | 0.000 | -0.114 |
| Nov 16 | 0.114 | +0.000 |
| Nov 15 | 0.114 | +0.000 |
| Nov 14 | 0.114 | +0.005 |
| Nov 13 | 0.109 | +0.015 |
| Nov 12 | 0.094 | +0.094 |
| Nov 11 | 0.000 | -0.043 |
| Nov 10 | 0.043 | -0.037 |
| Nov 9 | 0.079 | +0.000 |
| Nov 8 | 0.079 | +0.000 |
| Nov 7 | 0.079 | -0.020 |
| Nov 6 | 0.099 | +0.010 |
| Nov 5 | 0.089 | -0.016 |
| Nov 4 | 0.105 | -0.005 |
| Nov 3 | 0.109 | -0.013 |
| Nov 2 | 0.122 | +0.075 |
| Nov 1 | 0.047 | +0.028 |
| Oct 31 | 0.020 | +0.000 |
| Oct 30 | 0.020 | -0.010 |
| Oct 29 | 0.030 | — |
83 more days on file for this meter, back to August 7, 2026. Full meter-level history is part of Institutional (API and downloads).
Where It Is
Texas Gas TransmissionPlaced at the center of Trimble, KY — approximate; the exact meter site is not published.
Notices
No recent notices matched or named this point, and no severity 3+ notices on Texas Gas Transmission in the last 30 days. See all Texas Gas Transmission notices.
Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.
Other Power Generation meters on Texas Gas Transmission
- Lawrenceburg Power Plant 0.280 Bcf/d
- Cane Run Power Generation Del 0.109 Bcf/d
- TVA-Southaven 0.093 Bcf/d
- TVA-Lagoon Creek 0.083 Bcf/d
- Big Rivers - Sebree 0.050 Bcf/d
- Tva Paradise Pwr Plant Del 0.036 Bcf/d
- AB Brown Power Plant Del 0.024 Bcf/d
- Vectren - Johnson County Del 0.020 Bcf/d
Cite thisEnercast PipeScrape, Bedford #2 Ky. (Texas Gas Transmission loc 1522) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tgt/1522/