Gas day Nov 27
0.002
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.001
Bcf/d
30-day average
0.001
30 of 30 days posted
30-day high
0.002
Nov 25
30-day low
0.001
Nov 17
Operating capacity
0.009
Bcf/d as posted, late_0005 cycle
Utilization
17%
headroom 83%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0010.0010.0020.002Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.002+0.000
Nov 260.002-0.000
Nov 250.002+0.001
Nov 240.001+0.000
Nov 230.001+0.000
Nov 220.001+0.000
Nov 210.001+0.000
Nov 200.001+0.000
Nov 190.001+0.000
Nov 180.001+0.000
Nov 170.001+0.000
Nov 160.001+0.000
Nov 150.001+0.000
Nov 140.001+0.000
Nov 130.001+0.000
Nov 120.001+0.000
Nov 110.001+0.000
Nov 100.001+0.000
Nov 90.001+0.000
Nov 80.001+0.000
Nov 70.001+0.000
Nov 60.001+0.000
Nov 50.001+0.000
Nov 40.001+0.000
Nov 30.001+0.000
Nov 20.001+0.000
Nov 10.001+0.000
Oct 310.001+0.000
Oct 300.001+0.000
Oct 290.001—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)Goliad Midstream Energy/City of Magnolia,TX-Enderli Street,Montgom

Texas Eastern (TETCO)Placed at the center of Montgomery, TX — approximate; the exact meter site is not published.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, Goliad Midstream Energy/City of Magnolia,TX-Enderli Street,Montgom (Texas Eastern Transmission (TETCO) loc 73878) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/73878/