National Grid Metro NY, Goethals Rd., Staten Island, Richmond Co.,

Texas Eastern Transmission (TETCO) · Loc 74058 · RICHMOND, New York
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.226
Bcf/d scheduled
Δ Day-over-day
+0.143
vs Nov 25
7-day average
0.095
Bcf/d
30-day average
0.081
30 of 30 days posted
30-day high
0.226
Nov 26
30-day low
0.045
Oct 30
Operating capacity
0.660
Bcf/d as posted, late_0005 cycle
Utilization
34%
headroom 66%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.000.100.200.30Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.226+0.143
Nov 250.083-0.044
Nov 240.128+0.075
Nov 230.053+0.006
Nov 220.046-0.012
Nov 210.058-0.012
Nov 200.070+0.014
Nov 190.057-0.015
Nov 180.072-0.024
Nov 170.096-0.001
Nov 160.097-0.016
Nov 150.112-0.011
Nov 140.123+0.005
Nov 130.119+0.024
Nov 120.094+0.027
Nov 110.068-0.007
Nov 100.074-0.017
Nov 90.091+0.019
Nov 80.072+0.008
Nov 70.064+0.002
Nov 60.062+0.011
Nov 50.051-0.005
Nov 40.056-0.014
Nov 30.070+0.002
Nov 20.068-0.005
Nov 10.073+0.009
Oct 310.064+0.019
Oct 300.045-0.028
Oct 290.073+0.006
Oct 280.067—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)National Grid Metro NY, Goethals Rd., Staten Island, Richmond Co.,

Texas Eastern (TETCO)Placed at the center of Richmond, NY — approximate; the exact meter site is not published.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…