Gas day Nov 26
0.068
Bcf/d scheduled
Δ Day-over-day
-0.051
vs Nov 25
7-day average
0.034
Bcf/d
30-day average
0.023
30 of 30 days posted
30-day high
0.119
Nov 25
30-day low
0.005
Nov 24
Operating capacity
0.444
Bcf/d as posted, late_0005 cycle
Utilization
15%
headroom 85%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.000.050.100.15Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.068-0.051
Nov 250.119+0.114
Nov 240.005-0.004
Nov 230.009-0.010
Nov 220.019+0.005
Nov 210.014+0.008
Nov 200.006+0.000
Nov 190.006-0.017
Nov 180.023+0.017
Nov 170.006+0.000
Nov 160.006+0.000
Nov 150.006-0.005
Nov 140.011-0.003
Nov 130.014-0.015
Nov 120.029+0.003
Nov 110.026+0.015
Nov 100.011-0.002
Nov 90.013-0.012
Nov 80.025+0.000
Nov 70.025+0.000
Nov 60.025+0.012
Nov 50.013-0.020
Nov 40.033+0.000
Nov 30.033+0.017
Nov 20.016-0.006
Nov 10.021-0.011
Oct 310.032+0.000
Oct 300.032+0.013
Oct 290.019-0.008
Oct 280.027—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)Columbia Gas of PA. - Eagle, PA

Texas Eastern (TETCO)Placed at the center of Centre, PA — approximate; the exact meter site is not published.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.