Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

PECO Energy - Hatfield, PA

Texas Eastern Transmission (TETCO) · Loc 72405 · MONTGOMERY, Pennsylvania
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.035
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 25
7-day average
0.035
Bcf/d
30-day average
0.033
30 of 30 days posted
30-day high
0.036
Nov 24
30-day low
0.018
Oct 31
Operating capacity
0.079
Bcf/d as posted, late_0005 cycle
Utilization
45%
headroom 55%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0100.0200.0300.040Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.035+0.000
Nov 250.035-0.000
Nov 240.036+0.000
Nov 230.036+0.002
Nov 220.034+0.000
Nov 210.034+0.000
Nov 200.034-0.001
Nov 190.035+0.000
Nov 180.035-0.000
Nov 170.036+0.000
Nov 160.035+0.000
Nov 150.035+0.000
Nov 140.035+0.000
Nov 130.035+0.000
Nov 120.035+0.000
Nov 110.035+0.000
Nov 100.035+0.000
Nov 90.035+0.000
Nov 80.035+0.000
Nov 70.035+0.002
Nov 60.034+0.000
Nov 50.034+0.000
Nov 40.034-0.000
Nov 30.034-0.001
Nov 20.035+0.000
Nov 10.035+0.018
Oct 310.018+0.000
Oct 300.018+0.000
Oct 290.018-0.000
Oct 280.018—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)PECO Energy - Hatfield, PA

Texas Eastern (TETCO)Placed at the center of Montgomery, PA — approximate; the exact meter site is not published.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, PECO Energy - Hatfield, PA (Texas Eastern Transmission (TETCO) loc 72405) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tetco/72405/