Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

UGI UTIL (Columbia Gas) - Reading, PA

Texas Eastern Transmission (TETCO) · Loc 70322 · BERKS, Pennsylvania
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.010
Bcf/d scheduled
Δ Day-over-day
-0.007
vs Nov 25
7-day average
0.013
Bcf/d
30-day average
0.017
20 of 30 days posted
30-day high
0.020
Nov 18
30-day low
0.005
Nov 9
Operating capacity
0.141
Bcf/d as posted, late_0005 cycle
Utilization
7%
headroom 93%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0050.0100.0150.020Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.010-0.007
Nov 250.017+0.007
Nov 240.010-0.009
Nov 230.019—
Nov 22——
Nov 21——
Nov 200.010+0.000
Nov 190.010-0.010
Nov 180.020—
Nov 17——
Nov 160.020—
Nov 15——
Nov 14——
Nov 130.018-0.002
Nov 120.020+0.000
Nov 110.020+0.000
Nov 100.020+0.015
Nov 90.005—
Nov 8——
Nov 7——
Nov 60.019+0.000
Nov 50.019—
Nov 4——
Nov 30.019-0.000
Nov 20.020+0.000
Nov 10.020—
Oct 31——
Oct 30——
Oct 290.019+0.000
Oct 280.019—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)UGI UTIL (Columbia Gas) - Reading, PA

Texas Eastern (TETCO)Placed at the center of Berks, PA — approximate; the exact meter site is not published.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, UGI UTIL (Columbia Gas) - Reading, PA (Texas Eastern Transmission (TETCO) loc 70322) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tetco/70322/