UGI Utilities, Inc. (Columbia Gas) -Lancaster, PA

Texas Eastern Transmission (TETCO) · Loc 70070 · LANCASTER, Pennsylvania
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.027
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.030
Bcf/d
30-day average
0.026
30 of 30 days posted
30-day high
0.061
Oct 29
30-day low
0.005
Nov 4
Operating capacity
0.076
Bcf/d as posted, late_0005 cycle
Utilization
35%
headroom 65%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.0000.0200.0400.0600.080Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.027+0.000
Nov 260.027-0.006
Nov 250.033-0.003
Nov 240.036-0.008
Nov 230.043+0.025
Nov 220.018-0.010
Nov 210.028-0.012
Nov 200.040-0.000
Nov 190.041+0.016
Nov 180.024-0.010
Nov 170.034+0.003
Nov 160.031+0.006
Nov 150.025+0.005
Nov 140.019-0.014
Nov 130.034+0.023
Nov 120.010+0.000
Nov 110.010-0.014
Nov 100.024-0.008
Nov 90.032+0.018
Nov 80.014+0.002
Nov 70.012+0.006
Nov 60.006-0.011
Nov 50.017+0.012
Nov 40.005-0.001
Nov 30.006-0.020
Nov 20.026+0.003
Nov 10.023-0.015
Oct 310.038-0.003
Oct 300.041-0.020
Oct 290.061—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)UGI Utilities, Inc. (Columbia Gas) -Lancaster, PA

Texas Eastern (TETCO)Placed at the center of Lancaster, PA — approximate; the exact meter site is not published.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, UGI Utilities, Inc. (Columbia Gas) -Lancaster, PA (Texas Eastern Transmission (TETCO) loc 70070) scheduled quantity, gas day November 27, 2026. https://enercast.com/meter/tetco/70070/