National Grid Metro NY, Goethals Rd., Staten Island, Richmond Co.,

Texas Eastern Transmission (TETCO) · Loc 70058 · RICHMOND, New York
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 26
0.000
Bcf/d scheduled
Δ Day-over-day
-0.167
vs Nov 25
7-day average
0.080
Bcf/d
30-day average
0.087
30 of 30 days posted
30-day high
0.188
Nov 13
30-day low
0.000
Nov 26
Operating capacity
0.793
Bcf/d as posted, late_0005 cycle
Utilization
0%
headroom 100%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.000.050.100.150.20Oct 28Nov 2Nov 7Nov 12Nov 17Nov 22 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 260.000-0.167
Nov 250.167+0.049
Nov 240.118+0.034
Nov 230.084+0.017
Nov 220.068+0.007
Nov 210.060-0.001
Nov 200.062-0.001
Nov 190.063-0.022
Nov 180.085+0.003
Nov 170.082-0.067
Nov 160.148-0.010
Nov 150.158+0.006
Nov 140.152-0.036
Nov 130.188+0.101
Nov 120.087-0.001
Nov 110.087+0.004
Nov 100.083-0.029
Nov 90.112+0.036
Nov 80.075-0.028
Nov 70.103+0.044
Nov 60.059+0.005
Nov 50.055-0.013
Nov 40.067-0.017
Nov 30.084+0.012
Nov 20.072+0.020
Nov 10.052-0.032
Oct 310.084+0.011
Oct 300.073+0.034
Oct 290.039-0.007
Oct 280.046—
78 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)National Grid Metro NY, Goethals Rd., Staten Island, Richmond Co.,

Texas Eastern (TETCO)Placed at the center of Richmond, NY — approximate; the exact meter site is not published.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…

Notices appear here on the free tier’s delay. Pro gets them in real time by email and Telegram.

Cite thisEnercast PipeScrape, National Grid Metro NY, Goethals Rd., Staten Island, Richmond Co., (Texas Eastern Transmission (TETCO) loc 70058) scheduled quantity, gas day November 26, 2026. https://enercast.com/meter/tetco/70058/