Enercast — at the moment it matters
Home / Daily Summary / LDC Citygate / Meter

PECO Energy - West Conshohocken, PA

Texas Eastern Transmission (TETCO) · Loc 70036 · MONTGOMERY, Pennsylvania
LDC citygate delivery · counted in LDC Citygate
Gas day Nov 27
0.041
Bcf/d scheduled
Δ Day-over-day
+0.000
vs Nov 26
7-day average
0.050
Bcf/d
30-day average
0.071
30 of 30 days posted
30-day high
0.154
Nov 13
30-day low
0.039
Nov 22
Operating capacity
0.167
Bcf/d as posted, late_0005 cycle
Utilization
24%
headroom 76%

Scheduled quantities as posted by Texas Eastern Transmission (TETCO) on its bulletin board, not metered flow, converted at 1 Bcf/d = 1,000,000 Dth/d. Same figure as this meter’s row on the LDC Citygate page.

0.000.050.100.150.20Oct 29Nov 3Nov 8Nov 13Nov 18Nov 23 Bcf/d
Show the 30-day table
Gas dayBcf/dΔ DoD
Nov 270.041+0.000
Nov 260.041-0.010
Nov 250.051-0.047
Nov 240.098+0.053
Nov 230.045+0.007
Nov 220.039+0.000
Nov 210.039-0.003
Nov 200.041-0.008
Nov 190.049-0.039
Nov 180.089-0.019
Nov 170.107-0.026
Nov 160.134+0.000
Nov 150.134+0.009
Nov 140.125-0.029
Nov 130.154+0.066
Nov 120.088+0.009
Nov 110.079-0.003
Nov 100.082-0.004
Nov 90.086+0.000
Nov 80.086+0.000
Nov 70.086+0.047
Nov 60.039+0.000
Nov 50.039+0.000
Nov 40.039-0.000
Nov 30.039-0.018
Nov 20.057-0.011
Nov 10.067+0.006
Oct 310.062+0.005
Oct 300.056+0.004
Oct 290.052—
79 more days on file for this meter, back to August 11, 2026. Full meter-level history is part of Institutional (API and downloads).
Texas Eastern (TETCO)PECO Energy - West Conshohocken, PA

Texas Eastern (TETCO)Placed at the center of Montgomery, PA — approximate; the exact meter site is not published.

Recent notices on Texas Eastern Transmission (TETCO)

Severity 3+ in the last 30 days on the same pipeline; not necessarily at this point. All Texas Eastern Transmission (TETCO) notices →

Texas Eastern Transmission (TETCO) · posted 2026-11-25 · effective 2026-11-26 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-12 · effective 2026-11-12 · informational
Texas Eastern Transmission (TETCO) · posted 2026-11-05 · effective 2026-11-07 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-09-25 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · informational
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · capacity constraint
TETCO has declared an unplanned outage between Tompkinsville and Danville Compressor Stations on Line 15 Valve Sections 2-4, requiring an immediate pressure restriction effective Gas Day October 6, 2026. North-to-South capacity on the 30-inch system is reduced to a minimum of app…
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-02 · force majeure
TETCO has declared a Force Majeure due to an unplanned outage on its 30-inch system north of Tompkinsville Compressor Station in Kentucky, affecting Line 15 Valve Sections 2-4 and also implicating Danville Compressor Station. The restoration timeline is unknown ('unclear at this …
Texas Eastern Transmission (TETCO) · posted 2026-10-30 · effective 2026-10-07 · capacity constraint
TETCO is providing an update on the unplanned outage on Line 15 between the Tompkinsville and Danville compressor stations (Valve Sections 2-4), originally posted under Notice 183681. Primary Firm nomination restrictions remain in effect with no fixed end date; TETCO targets a re…